ieee 802 11 tgv january 2010 agenda
Download
Skip this Video
Download Presentation
IEEE 802.11 TGv January 2010 Agenda

Loading in 2 Seconds...

play fullscreen
1 / 21

IEEE 802.11 TGv January 2010 Agenda - PowerPoint PPT Presentation


  • 196 Views
  • Uploaded on

IEEE 802.11 TGv January 2010 Agenda. Authors:. Date: 2010-01-21. Abstract. This presentation contains the IEEE 802.11 TGv agenda and motions for January 2010. TGv – January 2010. Call Meeting to Order

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' IEEE 802.11 TGv January 2010 Agenda' - keena


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
ieee 802 11 tgv january 2010 agenda
IEEE 802.11 TGv January 2010 Agenda

Authors:

Date: 2010-01-21

Dorothy Stanley, Aruba Networks

abstract
Abstract

This presentation contains the IEEE 802.11 TGv agenda and motions for January 2010.

Dorothy Stanley, Aruba Networks

tgv january 2010
TGv – January 2010
  • Call Meeting to Order
  • Policies and Procedures, Attendance reminder, see http://www.ieee802.org/PNP/2008-11/LMSC_OM_approved_081114.pdf
    • **IEEE Patent Policy http://standards.ieee.org/board/pat/pat-slideset.ppt
      • Are there any patent claim(s)/patent application claim(s) and/or the holder of patent claim(s)/patent application claim(s) that the participant believes may be essential for the use of that standard? Minute any responses that were given, specifically the patent claim(s)/patent application claim(s) and/or the holder of the patent claim(s)/patent application claim(s) that were identified (if any) and by whom.
    • ***Affiliation FAQ - http://standards.ieee.org/faqs/affiliationFAQ.html
    • Anti-Trust FAQ - http://standards.ieee.org/resources/antitrust-guidelines.pdf
    • Ethics - http://www.ieee.org/portal/cms_docs/about/CoE_poster.pdf
    • IEEE 802.11 Policies and Procedures - http://www.ieee802.org/11/DocFiles/06/11-06-0812-03-0000-802-11-policies-and-proceedures.htm
    • IEEE 802 Policies and Procedures - http://www.ieee802.org/policies-and-procedures.pdf

** Read slide deck

*** Note especially items #7 & #11

Dorothy Stanley, Aruba Networks

tgv agenda
TGv Agenda
  • Monday PM1
    • Chair’s Welcome, Status, Review of Objectives
    • Comment Resolution – TIM Broadcast (10-0034), Timing Measurement (09-1325, 1326)
  • Weds PM 1
    • Comment Resolution – MIB, CID 94 (10-0106-00)
    • Motion- CIDs 98, 315, 316, 50, 52, 22, 23, 220, 94, TFS, Channel Usage
    • Collocated Interference
  • Tuesday AM2
    • Comment Resolution – Virtual AP (10-0025), Collocated Interference (10-0014), 50, 52
    • Motions – Alternate Transport, TIM Broadcast
  • Thurs PM 1
    • Timing Meas CIDs 100, 101, 317, 116 (10-0148-01)
    • Comment Resolution – BSS Transition Mgt (09-1298-05)
    • Firmware Update Notification (10-0029, 30)
    • Motions
  • Tuesday Evening
    • Comment Resolution – CID 222 (10-0022), TFS, Sleep Mode, DMS (09-1305), Channel Usage
    • Presentation – Gabor – 10-0086
    • Motion – Virtual AP, Timing Meas, 222
  • Thurs PM2
    • Comment Resolution – Addn’l MIB changes
    • Motions
    • Plans for March, telecons
    • Adjourn

Attendance reminder: http://newton/ **for each timeslot*** Documents: https://mentor.ieee.org/802.11/documents

Dorothy Stanley, Aruba Networks

january meeting status objectives
January Meeting Status & Objectives
  • TGv Status
    • Draft 7.04 available
    • Initial Sponsor Ballot Comments available in 11-09-1122
    • Initial SB passed, 80+%, 327 comments
  • Meeting Objectives
    • Comment Resolution
    • SB Recirculation Letter Ballot

Dorothy Stanley, Aruba Networks

tgv schedule history
TGv Schedule History
  • Wireless Network Management SG formed – Jan 2004
  • Wireless Networks Management TG formed – Nov 2004
  • Call for proposals – Sept 2005
  • Base line accepted - January 06
  • Submissions addressing objectives - Started in March 06
  • TG Ad-Hoc Draft Internal Review - October 06 to present
  • LB 108 Results: 132 yes -77 no -38 abstain, 63% approval, comments in 11-07-2368 [2006, 1451T, 555E]
  • LB 123 Results: 126 yes, 62 no, 34 abstain, 67% approval, comments in 11-08-0265 [1034, 820T, 214E]
  • LB 133 Results: 106 yes, 47 no, 28 abstain, 69% approval, comments in 11-08-0801 [1414, 784T, 629E]
  • LB 140 Results: 149 yes, 36 no, 40 abstain, 80% approval, comments in 11-08-1467 [586, 418T, 168E]
  • LB 146 Results: 155 yes, 32 no, 41 abstain, 83% approval, comments in 09-434, [321, 225T, 96E]
  • LB150 Results: 172 yes, 20 no, 38 abstain, 89% approval, comments in 09-676, [140, 93T, 47E]
  • LB155 Results: 176 yes, 16 no, 38 abstain, 92% approval, comments in 09-929, [24, 12T, 12E]
  • SB1 Results: 105 yes, 26 no, 6 abstain, 80.8% approval, comments in 09-1122, [327, 180T, 123E, 24G]

Dorothy Stanley, Aruba Networks

tgv timeline updated sept 2009
TGv Timeline – Updated Sept, 2009
  • Initial Working Group Letter Ballot: July 07 – completed
    • Jan 08 – D2.0, May 08 – D3.0, Nov 08 – D4.0
  • Re-circulation Working Group Letter Ballot: November 08 (D4.0)
    • Mar 09 – D5.0, May 09 – D 6.0, July 09 – D7.0, D7.0(unchanged)
  • Form Sponsor Ballot Pool: August 09 (was June 09)
  • Initial Sponsor Ballot: Oct 09
    • Oct 09 – D7.0 (was Sept 09)
  • Approved Sponsor Ballot: Nov 09
    • Jan 09 – D8.0, Feb D9.0, March D10.0, April D11.0
    • May 12th ( or so) for Revcom June Approval
  • Final WG/EC Approval: July 2010
  • RevCom/Standards Board Approval: June 4th/June 5th(or so)
  • Note: TGv PAR is authorized through Dec 2010

Dorothy Stanley, Aruba Networks

slide8

No Changes, no new valid

DISAPPROVE

votes, all conditions met

TGv Dates & Info

7 days

Sept 25-2Oct

7 days

WG

recirc

ballots

Final

Change

draft

“Conditions met”

Note to EC

no new valid DISAPPROVE votes

myBallot Tools

4

  • EC Presentation
  • Unsatisfied Comments
  • Comment resolutions
  • Ballot schedule
  • See clause 13

D7.0

23Jul-7Aug

  • SB Package
  • Draft
  • Redline
  • Cover letter

D4.0, 5.0, 6.0

Submit

to

Kipness

Begin

SB

SB

Comment

resolution

1

Mandatory

17Jul09

5Oct09 – 4Nov09

2

1Jun09

30 days

Request

Review

Start

Close

Editorial Coordination

Mandatory Editorial Coordination

- Jan10 D8.0

- Feb/Mar10 D9.0

- Mar/Apr10 D10.0

- Mar (cond) or

July EC to Revcom

- June or

Sept RevCom to SB

17Aug09

TG chair

SB Group Formation

Request

3

Amendment

Specific

Sponsor Ballot

Group

802 chair

SB Group Formation

Approval

Submit

to

Kipness

Min 30

days

Open

Invitation

Close

Invitation

WG chair

SB Group Formation

Request

1 Oct09

Generic

Sponsor Balloter

Pool

Dorothy Stanley, Aruba Networks

tgv d7 0 content summary
TGv D7.0 Content Summary
  • BSS Transition Management for Network Load Balancing
  • Channel Usage
  • Co-located Interference Reporting
  • Diagnostic Reporting
  • Directed Multicast Service
  • Event Reporting
  • Flexible Broadcast/Multicast service
  • Multicast Diagnostics Reporting
  • Multiple BSSID Support
  • Multiple SSID
  • Proxy ARP
  • Location, Timing Measurement
  • TIM Broadcast
  • TFS
  • Sleep Mode
  • Approximately 340 Pages of content

Dorothy Stanley, Aruba Networks

jan mar 2010 meeting planning
Jan- Mar 2010 Meeting Planning
  • Objectives
    • Comment Resolution
    • Sponsor Ballot Recirculation
  • Conference Calls
    • Tues Feb 16, March 2, March 9
  • Ad-Hoc meeting - none

Dorothy Stanley, Aruba Networks

motion 1
Motion 1
  • Move to adopt the agenda in 11-10-0031-01-000v-TGv-January-2010-agenda.
  • Mover:Unanimous
  • Seconder:
  • Result:

Dorothy Stanley, Aruba Networks

motion 2
Motion 2
  • Move to approve the meeting minutes in 11-09-1166-00-000v-tgv-november-2009-meeting-minutes.doc and 11-09-1307-03-000v-TGv-Dec-09-Jan-10-telecon-meeting-notes.doc.
  • Mover: Unanimous
  • Seconder:
  • Result:

Dorothy Stanley, Aruba Networks

motion 3
Motion 3
  • Move to
    • Resolve General CIDs 255 and 256 as “Principle” with a resolution detail of “Adopt the text changes indicated in https://mentor.ieee.org/802.11/dcn/09/11-09-0598-06-000v-alternative-transport-for-reports.doc “
    • Adopt the TIM Broadcast category comment resolutions in 10-0034-00
  • as approved comment resolutions for TGv Draft 7.0 Initial Sponsor ballot comments.
  • Moved: Allan Thomson
  • Seconded: Roger Durand
  • Result: 10-0-3 Passes

Dorothy Stanley, Aruba Networks

motion 4
Motion 4
  • Move to
    • Adopt the comment resolutions for “accepted”, “disagree” and “principle” Timing Measurement category comments in 09-1325-03, except for CIDs 100, 101, 116, and 317.
    • Adopt the comment resolutions for “accepted”, “disagree” and “principle” Virtual AP category comments in 10-0025-02, except for CID 253
    • Resolve CID 222 as “Principle” with a resolution detail of “Adopt the text changes indicated in https://mentor.ieee.org/802.11/dcn/10/11-10-0022-00-000v-sb-cid-222-rx-plcp-procedure.doc “
  • as approved comment resolutions for TGv Draft 7.0 Initial Sponsor ballot comments.
  • Moved: Brian Hart
  • Seconded:Allan Thomson
  • Result: 8-0-1 Passes

Dorothy Stanley, Aruba Networks

motion 5
Motion 5
  • Move to
    • Resolve CIDs 98 and 315 as “Disagree” with a resolution detail of “The comment and the proposed change lack sufficient detail to be implemented”
    • Resolve CID 316 as “Disagree” with a resolution detail of “The AP and STA behaviors are specified in 11.22.8”
    • Adopt the TFS category comment resolutions in 09-1035-02
    • Adopt the Channel Usage category comment resolution in 09-1035-02
    • Adopt the resolutions for CIDs 22 and 23 in 09-1192-07
    • Resolve CID 220 as “Disagree” with a resolution detail of “The comment and the proposed change lack sufficient detail to be implemented”
    • Resolve CIDs 50 and 52 as “Principle” with a resolution detail of “Adopt the text changes indicated in https://mentor.ieee.org/802.11/dcn/10/11-10-0061-00-000v-improvements-to-11v-directed-multicast-services-dms.doc “
    • Resolve CID 94 as “Principle” with a resolution detail of “Adopt the text changes indicated in https://mentor.ieee.org/802.11/dcn/10/11-10-0106-01-000v-sb-tclas-negotiation.doc “
  • as approved comment resolutions for TGv Draft 7.0 Initial Sponsor ballot comments.
  • Moved: Allan Thomson
  • Seconded:Ganesh Venkatesan
  • Result: 8-0-1 Passes

Dorothy Stanley, Aruba Networks

motion 6
Motion 6
  • Move to
    • Adopt the resolutions for CIDs 71, 74, 84, 272 and 273 in 10-0014-02 (Collocated Interference)
    • Resolve CIDs 69, 70, 72, 73, 75, 78, 79, 80, 81, 82, 83, 85 as “Principle” with a resolution detail of “Adopt the text changes indicated in https://mentor.ieee.org/802.11/dcn/10/11-10-0131-02-000v-proposed-modifications-to-the-11v-collocated-interference-reporting-feature.doc“
    • Resolve CIDs 323 and 291 as “Disagree” with a resolution detail of “The commenter has withdrawn the comment”
    • Incorporate the text changes indicated in https://mentor.ieee.org/802.11/dcn/10/11-10-0049-00-000v-tgv-draft7-04-mib-compilation-results.doc
    • In TGv Draft 7.04 P233L24, change from
      • The AP may decide to reject a new DMS or cancel a granted DMS at any time based on network condition, i.e. the number of associated STAs and channel load and so on.
      • To
      • The AP may decide to reject a new DMS or cancel a granted DMS at any time based on network condition, for example the number of associated STAs and channel load.
      • And Delete P263L40-42 and P264L51-65 and P265L1-16 references to dot11DMSMaxSTAS INTEGER, dot11DMSMaxChannelLoadForNewService INTEGER, and dot11DMSMaxChannelLoad INTEGER)
    • In TGv Draft 7.04, P224L23, change from
      • “the AP shall include at least one BSS candidate from that list with a non-zero Preference field value in the BSS Transition Candidate List Entries field”
      • to
      • “the AP should include at least one BSS candidate from that list with a non-zero Preference field value in the BSS Transition Candidate List Entries field”
  • as approved comment resolutions for TGv Draft 7.0 Initial Sponsor ballot comments.
  • Moved: Alex Ashley
  • Seconded: Ian Sherlock
  • Result:6-0-1 Passes

Dorothy Stanley, Aruba Networks

motion 7
Motion 7
  • Move to
    • Adopt the Sleep Mode category comments in https://mentor.ieee.org/802.11/dcn/09/11-09-1305-03-000v-sb-comments-dmstfs.xls , except for CID 125
    • Resolve DMS comments 20, 21, 221as “Principle” with a resolution detail of “Adopt the text changes in https://mentor.ieee.org/802.11/dcn/10/11-10-0132-01-000v-modifications-to-the-11v-dms-feature.doc “
    • Resolve CIDs 100, 101, and 317 as “disagree” with a resolution detail of “The comment and the proposed change lack sufficient detail to be implemented”
  • as approved comment resolutions for TGv Draft 7.0 Initial Sponsor ballot comments.
  • Moved: Allan Thomson
  • Seconded: Chris Hartman
  • Result: 5-0-0 Passes

Dorothy Stanley, Aruba Networks

motion 8
Motion 8
  • Move to
    • Approve Teleconferences
      • Tuesday Feb 16, March 2, March 9
      • Noon Eastern
      • 2 hours
  • Moved: Qi Wang
  • Seconded: Peter Loc
  • Result: 3-1-2 Passes

Dorothy Stanley, Aruba Networks

motion 9
Motion 9
  • Move to
    • Adopt the changes indicated in https://mentor.ieee.org/802.11/dcn/10/11-10-0162-00-000v-draft-p802-11v-a1-mibs-redlines.pdf
    • Resolve CID 253 as “Disagree” with a resolution detail of “The code provided by the commenter does not produce the results illustrated in Annex L”
    • Resolve CID 254 as “Principle” with a resolution detail of “Will be applied by the Working group editor in the publication process”
    • Resolve CID 116 as “Disagree”, with a resolution detail of “The comment and the proposed change lack sufficient detail to be implemented”
    • Resolve CID 125 as “Principle” with a resolution detail of “Adopt the text changes in https://mentor.ieee.org/802.11/dcn/10/11-10-0171-00-000v-tgvsb1-cid-125 “
  • as approved comment resolutions for TGv Draft 7.0 Initial Sponsor ballot comments.
  • Moved: Allan Thomson
  • Seconded: Ganesh Venkatesan
  • Result: 11-0-0 Passes

Dorothy Stanley, Aruba Networks

motion 10
Motion 10
  • Having approved comment resolutions for all of the comments received from the Initial Sponsor ballot on IEEE P802.11v/D7.0, instruct the editor to prepare IEEE P802.11v/D8.0 incorporating the approved resolutions and
  • Approve a 15 day Recirculation Sponsor Ballot on IEEE P802.11v/D8.0.
  • Moved: Allan Thomson
  • Seconded: Ian Sherlock
  • Result: 11-0-1 Passes

Dorothy Stanley, Aruba Networks

references
References

Dorothy Stanley, Aruba Networks

ad