Special Manpower Development Programme in VLSI – Phase II (SMDP- II)

Special Manpower Development Programme in VLSI – Phase II (SMDP- II) . Review For the year 2011 Resource Centres ( RCs ) February 10-11,2012 @ IIT Kanpur . Status of Infrastructure. Status of manpower generated. Status of fund utilization.

keaton
Download Presentation

Special Manpower Development Programme in VLSI – Phase II (SMDP- II)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Special Manpower Development Programme in VLSI – Phase II (SMDP- II) Review For the year 2011 Resource Centres (RCs) February 10-11,2012 @ IIT Kanpur

  2. Status of Infrastructure

  3. Status of manpower generated

  4. Status of fund utilization **Confirmation of continuation is required. Otherwise it would be hard to pay the salary of the project staff.

  5. Status of other activities

  6. Quick Check

  7. Additional information

  8. Chips to Systems Proposal Contour 1. Project Name - An embedded high resolution ultrasonography system using fundamental and harmonic imaging 2. Total Outlay – 541 Lakhs (Including all institute) 3. Duration – 5 Years • Manpower Requirement – @ RC: 2 Research Consultant, 2 Senior Project Assistant, 1 Technician for testing, 1 Job Assistant @PI: 2 Guest Faculty per PI

  9. Software Required for C2S • Cadence: 5 year subscription for 20 licenses of each module indicated below • Full Custom/Analog/Mixed Signal/RFIC Design Flow tool set • Functional verification tool set • System design and verification tool set • Logic Design tool set • Digital Implementation tool set • Manufacturability Signoff tool set • IC packaging and SiP design tool set • PCB Design tool set • Synopsys: 5 year subscription for 10 licenses of each module indicated below • System Level Design tool set • Digital and analog design & verification tool set • Implementation and signoff tool set • Manufacturing tool set • TCAD process and device simulation tool set • Mentor Graphics: 5 year subscription for tool set available under Mentor Higher Education Programme • Xilinx: 5 year subscription for 50 licenses of each module indicated below • Software Requirements: Xilinx Latest version with system edition • Hardware Requirements: Virtex-6 and Spartan-6 boards

  10. Objective of C2S Main output from the project: Development of JPEG-2000 on ASIC. (IIT KGP, BESU) Development of FFT/IFFT unit (IIT KGP) Development of knowledge base system. (IIT KGP) Telemedicine solution along with the system. (IIT KGP, BESU ) CAM Memory Design (JU) DSP/DIP chips (NIT DGP, IIT KGP, BESU, JU) Portable Low-Cost Ultrasound System design (IIT KGP, PSG College Tech.) Design & Development of image and video processing algorithm (IIT KGP, PSG Coll. Tech, NIT DGP, BESU, JU) Over all System Integration (IIT KGP). Application area in which system would find use: Healthcare Manpower at Ph.D & Masters level proposed to be generated as a secondary outcome of the project: Same as SMDP-II Name of the PIs along with whom collaborative development work would be carried out for designing the identified targeted system: (a) IIT Kharagpur, (b) BESU, Howrah, (c) Jadavpur University, (d) NIT Durgapur, (e) PSG College of Tech. Coimbatore

  11. Year wise Outputs of the C2S