Overview of activities of the first six months and of the next six months

Overview of activities of the first six months and of the next six months. Angelo Frascella. We are here !. Ended Tasks. Running Tasks. Starting Tasks. In synthesis. Data Structure Scenarios and use case/services at good point 7 technical deliverable has to be delivered within M12

keaira
Download Presentation

Overview of activities of the first six months and of the next six months

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overview of activities of the first six months and of the next six months Angelo Frascella

  2. We are here!

  3. Ended Tasks

  4. Running Tasks

  5. Starting Tasks

  6. In synthesis • Data Structure Scenarios and use case/services at good point • 7 technical deliverable has to be delivered within M12 • One is almost ready (D1.1 – M6) • An incoming one (D2.1 – M7) collecting results from T2.1 and T2.2 seems in at good point for T2.1, still not available for T2.2 part • Next deliverables: • D3.1 – M8 (AUEB), D1.2 – M9 (DITF), D1.3 – M9 (AUEB), D3.2 – M10 (ATC), D2.2 – M12 (ATC)

  7. Some general results required in the first months • First needed results inside the project (from KoM decisions) • WP1: • Scenarios definition - DITF =>done • Services and tools definitions – AUEB => done • Identification of machine and processes - DOMINA=> running • Assessment of scenarios with Piacenza – ENEA => done • Definition of parameter that have been optimized – ENEA => running • Collecting and analysis of consumption data – ENEA =>running • Validation of Scenarios by IIG – EURATEX => ongoing • WP2: • Needed data and meters - AUEB-RC => to do? • Available data and meters – DOMINA => to do

  8. Some general results required in the first months • WP 3: • Set of real data about production scheduling and routing collected in the space of two weeks – DOMINA and DITF => To do • WP 5: • Definition of questions that need an answer in order to allow to define the architecture requirements – INTRA => done? • Decision about UML tool to use – INTRA => done • First analysis about data format for interfacing ERP and MES (from TEXWIN) and supply chain partners (MODA-ML) (ENEA and DOMINA) => to do • WP 8 • Wiki structure and content about ARTISAN Architecture => done (and, up to now, not used)

  9. Deliverable dashboard on the web site Please, watch the dashboard: http://www.artisan-project.eu/artisan/imple/pgcl.asp?lingua=en&p=462&node_id=7.4 Or, by menu, RESERVED AREA -> DELIVERABLE LIST

  10. A remainder • Don’t forget to send me filled templates about: • Activities reporting for the first six months • Periodic Progress report for the first six months • Timesheet for the first six months

  11. Thank you for your attention