An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integrated Asset ManagementRoads and Highways Jugal Makwana Bentley Systems

  2. Why What When Where How Asset Management

  3. Asset Creation Asset Maintenance Asset Upgrade 51.7 6.4 *BMI Infrastructure Report Q4-2011

  4. What? It depends on who we ask A B Bridge Engineer Pavement Engineer C D Safety Analyst Roads Engineer Senior Mgmt

  5. STREET LIGHT: BRIDGE ALIGNMENT TRAFFIC TRAFFIC LIGHT STREET SIGN LANES/WIDTHS ROAD CONDITION BARRIER POT HOLE

  6. If we put the pieces together: ?

  7. From Opus International Improving the Condition of the Asset Better Condition Better Work More Work Better Quality Better Intervention Optimum Service Levels More Money Current Funding More Funding

  8. Better Asset Management Practices From Opus International Improving the Condition of the Asset Better Condition Better Work More Work ? X Better Quality Better Intervention Optimum Service Levels More Money Current Funding More Funding

  9. The AASHTO definition of Asset Management supports this conclusion: “Asset Management is: A strategic approach to managing transportation infrastructure. It focuses on business processes for resource allocation and utilization with the objective of better decision making based upon quality information and well defined objectives.” Conclusion Asset Management needs Information!

  10. Engineering Information Management through Asset LifeCycle Project Information Management(PIM) Asset LifecycleInformation Management(ALIM) Asset Information Management(AIM) Asset & Project Portfolio Info Management(APPIM) Source: ARC Advisory Group

  11. Engineering Information Management (EIM) Through Bentley’s Integrated Asset Information Solution Bentley traditional market Design and Project Information EIM - AssetWise Asset Information and Decision Support Each deliver value in their own right but when we bring them together we provide asset lifecycle management

  12. Engineering Information Management (EIM) An operations information modeling platform for delivering asset lifecycle information management Asset Model Bentley traditional market Design And Map/Civil/Bridge MicroStation ProjectWise More….

  13. Engineering Information Modeling

  14. What is Engineering Information Management? An operations information modeling platform for delivering asset lifecycle information management AssetWise Asset Model Bentley traditional market Design And MXRoad LRS and applications MicroStation SuperLoad OPTRAM ProjectWise ProjectWise and AssetWise provide powerful Information Management Insight More….

  15. Asset Information ProvidesDecision Support !

  16. BRIDGE CATEGORY: Overpass STREET: Fairbrook Rd. INSPECTED: 30 April 2007 INSPECTOR: R. Flannery HEIGHT: 22.5 feet ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET START: 2018 feet OFFSET FINISH: 2078 feet STREET LIGHT: CATEGORY: FWY illumination REPAIR DATE: 10 Oct 2009 REPAIR TYPE: Bulb HEIGHT: 21 feet MOUNTING BRACKET: Pole arm LAMP TYPE:1 Low Pressure Sodium SEGMENT:MP-127 OFFSET:1592 Feet TRAFFIC LIGHT CATEGORY: FWY entrance ILLUMINATED: yesREPAIR DATE: 15 Mar 2008 REPAIR TYPE: Bulb MOUNTING HT: 10.5 feet MOUNTING: pole ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET: 1516 feet STREET SIGN CATEGORY: merge ILLUMINATED: no MOUNTING HT: 11.5 feet MOUNTING: pole ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET: 1480 feet POT HOLE CATEGORY: Hwy defect DAMAGE REPORTED: 12 Jul 2009 REPAIR PRIORITY: High DATE REPAIRED: 15 Jul 2009 ROUTE: CA-I15 SEGMENT: MP-127 OFFSET START: 1270 feet OFFSET FINISH: 1274 feet BARRIER CATEGORY: Cement wall LENGTH: 128 feet ROUTE: CA-I15-N-M27 SEGMENT: MP-127 OFFSET: 1352 feet

  17. BRIDGE CATEGORY: Overpass STREET: Fairbrook Rd. INSPECTED: 30 April 2007 INSPECTOR: R. Flannery HEIGHT: 22.5 feet ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET START: 2018 feet OFFSET FINISH: 2078 feet STREET LIGHT: CATEGORY: FWY illumination REPAIR DATE: 10 Oct 2009 REPAIR TYPE: Bulb HEIGHT: 21 feet MOUNTING BRACKET: Pole arm LAMP TYPE:1 Low Pressure Sodium SEGMENT:MP-127 OFFSET:1592 Feet TRAFFIC LIGHT CATEGORY: FWY entrance ILLUMINATED: yesREPAIR DATE: 15 Mar 2008 REPAIR TYPE: Bulb MOUNTING HT: 10.5 feet MOUNTING: pole ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET: 1516 feet STREET SIGN CATEGORY: merge ILLUMINATED: no MOUNTING HT: 11.5 feet MOUNTING: pole ROUTE: CA-I15-N SEGMENT: MP-127 OFFSET: 1480 feet POT HOLE CATEGORY: Hwy defect DAMAGE REPORTED: 12 Jul 2009 REPAIR PRIORITY: High DATE REPAIRED: 15 Jul 2009 ROUTE: CA-I15 SEGMENT: MP-127 OFFSET START: 1270 feet OFFSET FINISH: 1274 feet BARRIER CATEGORY: Cement wall LENGTH: 128 feet ROUTE: CA-I15-N-M27 SEGMENT: MP-127 OFFSET: 1352 feet

  18. Managing more than just physical Road Assets… Road Works Accidents Parks and Places, BBQ’s… Traffic Data Enquiry Management

  19. Exor at a Glance EAM for Roads Asset Management Managing over 1,400,000 km of roads with an asset value exceeding US$750 billion 19

  20. Executive Information Information Manager Solutions footprint…depth and breadth… Pavement Manager, Asset valuations Pavement modelling, Asset valuations, Traffic congestion Maintenance Manager, Schemes Manager, Street Works Manager, Safety Manager E X O R SO LUTIONS Contract management, Works ordering and budgeting management, Multi-year programming, Road works co-ordination, Safety Analysis Executive Pavement Manager, Enquiry Manager, Document Manager, Spatial Manager , Network Manager, Structures Manager, Traffic Manager, Safety Manager, Street Works Manager Construction records, Document management, Spatial data management , Road Information, Structures Information, Traffic Information, Safety / Crash Information Integrate with other systems like HDM-4 Strategic Management & Planning Road network definition, Customer Service Desk, Field Data collection, Asset recording, Inspections recording, Road condition recording, Structures recording, traffic volume recording, safety / crash data, Street works notices / permits, asset valuation / depreciation ExorDatabase, Loaders, Web Services Field Data Collection software Operations and Management Information Management Data Recording

  21. AssetWise – Exor Road Asset Management Geographic Information Systems Oracle Spatial Exor Business Applications Other Departmental and Corporate Systems Location Referencing System Information Dashboard Asset Register Oracle Spatial Database Existing Legacy Systems Integration Using API’s GIS/ Spatial Display Existing Legacy Systems Exor Hub Technology

  22. Location Referencing System Asset Register Oracle Spatial Database Product Management Group Enquiry Manager Asset Valuation Manager MapCapture Street Lighting Manager Mobile Maintenance Manager Exor ‘Core’ Network Manager Asset Manager Public Rights of Way Schemes Manager Spatial Manager Traffic Interface Manager Exor ‘Core’ Exor ‘Core’ Noticing Manager Locator Structures Manager Permitting Manager Safety Manager Street Gazetteer Manager CIM / FIM UKPMS Exor ‘Core’

  23. Sharing Data without Duplication PMS / Condition Projects Exor Hub Traffic Data Asset Id : 906124 Lin Ref Type : County Route Route : CR123 – N From : 120 To: 125 Attributes: 12,3,4,a,etc CRASH (Safety)

  24. Data Displayed with Integrated Mapping

  25. Select Multiple Work Requests and Create a Work Order from the Map

  26. Example Engineering reporting – Assets along a route Assets and events located where they exist in the real world, not wholly contained within a ‘Fixed’ segment of ‘Network’

  27. 13 1 $ 26,000 Reconstruction Project (2000) 5 18 $ 1,500 Planned Maintenance (100) $ 5,000 8 11.5 Pothole Repair (2500) $500 $100 $8,000 $2,000 $6,300 $2,100 $16,100 $4,600 $3,150 $2,100 Exor provides powerful reporting across data sets Segment Cost Cost per mile

  28. 5.6 6.2 7.0 8.0 7.0 6.4 Width 100.07 101.52 101.7 101.83 101.95 102.16 102.54 30 40 31 29 41 25 Roughness 100.07 101.52 101.75 101.9 102 102.4 102.54 Merge Results Width < 8 AND Roughness <40 100.07 101.52 101.75 101.83 101.95 102 102.4 102.54 And Merge Query functionality like this

  29. Information Manager: Actionable Intelligence 29

  30. Information Manager: Actionable Intelligence

  31. Global Adopters 31

  32. National Road Works Portal www.roadworksonline.org.uk

  33. Summary • Engineering Information Management for Integrated Asset Management • Enhances interoperability • Other Bentley Asset Lifecycle solutions • Third Party Solutions • Proven Solutions • Post Go-Live Support • Active user Community • Enhancements • Safeguard user investment