Meeting Agenda February XX, 2004

Meeting Agenda February XX, 2004. AGENDA. White Paper Production System Test System Test Plan Systems Engineering Cost Analysis Questions and Additions. THERMAL PAPER. Were the evaporative cooling calculations I sent correct? Can evaporative cooling be included in the paper?

kawena
Download Presentation

Meeting Agenda February XX, 2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Meeting AgendaFebruary XX, 2004 HYPERION ERAU

  2. AGENDA • White Paper Production • System Test • System Test Plan • Systems Engineering • Cost Analysis • Questions and Additions HYPERION ERAU

  3. THERMAL PAPER • Were the evaporative cooling calculations I sent correct? • Can evaporative cooling be included in the paper? • What is the status of the paper? • Will a copy be ready for submittal on Feb. 15th? Is a copy ready now? HYPERION ERAU

  4. PERFORMANCE PAPER • An abstract was not submitted in time for 05 JPC • What was the status before work was stopped? • Can we ready a version for 06 JPC? HYPERION ERAU

  5. MONTE CARLO SIM. • Do we have a 1, 10, 100, 1000, 10000 track run completed, realistic beams, inside/outside shield? • Is there any graphical data to be documented yet? • What were the effects to Isp, thrust, ect… • Consider writing a short white paper for 06 JPC on Sim. (authors should only include those involved, i.e. Smith, Cox, Tiradoni) • $Cost$ HYPERION ERAU

  6. TEST LOCATION • Where will test occur? (ERAU PR, Lawrence Livermore, Las Alamos) • When will the test occur? (rough date) • These questions may be answered on a component level later in the meeting. • $Cost$ HYPERION ERAU

  7. TEST STAND • Is the Cavendish Balance Complete? • Is the stand calibrated? Do we know how we are going to calibrate the stand? • Document test stand and calibration technique • Have we considered how we are going to interface the thruster/sphere to the stand? • $Cost$ HYPERION ERAU

  8. VACUUM CHAMBER • What pressure are we going to test at? Consider effects such as out-gassing, convection currents, ect… • Will we use our own chamber or use another facility? • Consider size of penning trap, test stand to fit inside, and power interface requirements • $Cost$ HYPERION ERAU

  9. POSITRON STORAGE • Will we use the Positronics LLC Penning Trap? • Exactly how many e+’s does the trap store? • Do we know the method of ejecting the e+’s from the trap? • Does the discharge follow a linear or gaussian distribution? • What are the power requirements? • $Cost$ HYPERION ERAU

  10. DATA REDUCTION EQUIPMENT • Has the methods of data reduction been considered? • How much if any EMI shielding is needed for the electronics? • $Cost$ HYPERION ERAU

  11. SYSTEM TEST PLAN • We must start looking at integration of subsystems (power, data reduction equipment, test stand, thruster, ect…) • We must get ready to start writing test procedures HYPERION ERAU

  12. SYSTEMS ENGINEERING • Start documenting all research and white papers. • Document design and performance of test equipment (i.e. test stand) • Update Master Schedule (ASAP) • Update Contact Sheet (ASAP) • Completion of web site HYPERION ERAU

  13. COST ANALYSIS • Compile receipts of past expenditures and organize into a running list • Finish analysis of future costs for proposals • $Cost$ HYPERION ERAU

  14. QUESTIONS or ADDITIONS • ??? HYPERION ERAU