1 / 16

Recent VLBI Activities in China

Recent VLBI Activities in China. Zhi-Qiang Shen (Shanghai Astronomical Observatory). 2009 East Asia VLBI Workshop 18-20 March 2009, LG Convention Hall of International Education Building at the Ewha Woman's University , Seoul, Republic of Korea. CVN (4 stations+ soft-/hard-ware correlator).

Download Presentation

Recent VLBI Activities in China

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Recent VLBI Activities in China Zhi-Qiang Shen (Shanghai Astronomical Observatory) 2009 East Asia VLBI Workshop 18-20 March 2009, LG Convention Hall of International Education Building at the Ewha Woman's University, Seoul, Republic of Korea

  2. CVN (4 stations+ soft-/hard-ware correlator) 1993(25m) 2006(50m) 2460 1987(25m) 3249 1114 2158 2476 1920 2006(40m) 2006(correlator)

  3. CVN—Shanghai station (1987) Diameter: 25m Band: L, S/X, C, K Recording system: MK2, S2, MK3, MK4, MK5A

  4. CVN—Urumqi station (1993) Diameter:25m Band: P, L, S/X, C, K,(also 30 and 49 cm) Recording system: MK2, MK3, MK4, MK5A, K-4,K-5

  5. CVN—Kunming station (2006) Diameter; 40m (central 25m:full panel; 25 - 40m: mesh) Band : S/X Recording system: MK5A

  6. CVN—Beijing station (2006) Diameter:50m (central 30m: full panel; 30-50 m: mesh) Band: S/X Recording system: MK5A

  7. Mobile VLBI—Yunnan (2000) A Mobile VLBI System with 3m antenna was constructed by ShAO for the Xi’an Surveying and Mapping Institute in 2000 which is located in the Yunnan Astronomical Observatory. S/X

  8. CVN -VLBI data processing center Hardware correlator (5 stations) Software correlator (4 stations) Output data: CE-1 format FITS format (available?) Software for CE-1 data processing (near real time, in 5 min.)

  9. CVN - Application to CE-1 Orbit determination: USB+VLBI VLBI tracking distance > 20000km elevation > 5 degree output data: delay, delay rate, angular position output delay time: < 5 minutes 12h 3.5h 2h 环月轨道段 调相轨道段 48hX1 24hX3 16hX2 月球捕获轨道段 地月转移轨道段 6d

  10. VLBI Corrlator Post-data processing delay Delay rate <5 minutes later Control center in Beijing Angular position calculations R.A. Dec. O.D. VLBI center in Shanghai VLBI Center

  11. Chang’E National project 绕:Orbiting CE-1:Oct 2007 (482d/494d) CE-2: ~2010 落:Landing CE-3:~2012 回:returning

  12. Ending of CE-1: March 1, 2009

  13. e-VLBI 28 August 2007: Shanghai –Australia & Europe (256Mbps) 17 June 2008: Shanghai –Australia & Japan (512Mbps) 6 January 2009: Shanghai-Urumqi (256Mbps) 15-16 January 2009: IYA marathon obs. (Asia, Australia, Europe, America)

  14. FAST- Five-hundred-meter Aperture Spherical Telescope Unique Karst depression as the site Active main reflector Cable - parallel robot feed support Approved in Nov 2005; Start full construction in 2009; 9 bands from 70MHz to 3 GHz (Expected) 2014

  15. New 65m telescope in Shanghai Specs: 8 bands (1.4–43 GHz); active surface; operational at S/X bands before the end of 2012 … (refer to the talk by Bin Li for details)

  16. CVN by 2014 Thanks!

More Related