Lithium Hydride Absorber Program Update. Alan Bross MICE CM Sofia – October 5 th , 2010. LiH Discs. We will Procure: An instrumented LiH disc (30 cm diameter, 4 cm thick) for measuring thermal properties Two small (1.25” diameter X 0.25” thick) samples for radiation stability tests

Download Presentation

Lithium Hydride Absorber Program Update

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Lithium hydride absorber program update

Lithium Hydride Absorber ProgramUpdate

Alan Bross

MICE CM

Sofia – October 5th , 2010


Lih discs

LiH Discs

We will Procure:

  • An instrumented LiH disc (30 cm diameter, 4 cm thick) for measuring thermal properties

  • Two small (1.25” diameter X 0.25” thick) samples for radiation stability tests

  • One LiH disc (50 cm diameter, 6.5 cm thick)

    • For use in MICE Step III.1 - IV

  • Two LiH wedges

    • For use in MICE Step IV?

Alan Bross MICE CM - Sofia October 5, 2010


Mice step iii x or iv

MICE Step III.x or IV

Alan Bross MICE CM - Sofia October 5, 2010


Y12 national security complex

Y12 National Security Complex

  • Y12 is producing the LiH

  • Produced by Hot Isostatic Pressing (150 oC, 30,000 psi)

    • Will use existing mold

  • Final parts will be

    • Tested for Chemical composition and purity

    • Radio-graphed to ensure no voids

    • Machined to size

    • Dimensional inspection

    • Coated with epoxy completely

Alan Bross MICE CM - Sofia October 5, 2010


Lithium hydride absorber program update

The MICE Energy Absorber

  • New Hanger Arrangement

    • 3 SS straps

    • 1 Machined SS clamp

    • 45 cm diameter & 65 mm thick

Alan Bross MICE CM - Sofia October 5, 2010


Procurement disks

Procurement - Disks

  • Current Schedule

    • All disks are complete except for some final machining on the 12” disk that is to be instrumented.

      • Problem with a few of the holes

    • Other disks are in inspection

    • All machining should be done in 1 week

    • Then 1 week to do the paralene coating

    • Ship by November 1

Alan Bross MICE CM - Sofia October 5, 2010


Procurement wedges

Procurement - Wedges

Alan Bross MICE CM - Sofia October 5, 2010


Wedge 1 90 o

Wedge 1 – 90o

Alan Bross MICE CM - Sofia October 5, 2010


Wedge procurement

Wedge - Procurement

  • We have ordered a 90 wedge, but it will come in two pieces

  • Need to develop hanger

    • Run with full or ½ wedge

  • Wedge machining has not yet started

  • I do not have a delivery date yet.

Alan Bross MICE CM - Sofia October 5, 2010


Final wedge

Final ½ Wedge

Alan Bross MICE CM - Sofia October 5, 2010