Section V. Rights-of-Way and Special Use Authorizations. BLM and Forest Service . Objectives: Answer these questions--. When do I need to apply for a Right-of-Way (ROW) or Special Use Authorization (SUA)? How will BLM/FS notify me if a ROW or SUA is needed?

Download Presentation

Section V. Rights-of-Way and Special Use Authorizations

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Section v rights of way and special use authorizations l.jpg

Section V. Rights-of-Way and Special Use Authorizations

BLM and Forest Service


Objectives answer these questions l.jpg

Objectives: Answer these questions--

  • When do I need to apply for a Right-of-Way (ROW) or Special Use Authorization (SUA)?

  • How will BLM/FS notify me if a ROW or SUA is needed?

  • What is the review and approval process associated with a oil and gas ROW or SUA?


Overview l.jpg

Overview

  • Need for a Right-of-Way

  • Operator Notification

  • Review and Approval Process


Scenario 1 l.jpg

BLM Surface/Federal Minerals

Existing Road

Proposed road, powerline, etc

Proposed Well

Scenario 1

ROW not required for proposed oil and gas facilities on-lease


Scenario 2 l.jpg

ROW Required

Proposed Well

Scenario 2

ROW required for proposed oil and gas facilities downstream from custody transfer point, whether on or off lease

BLM Surface/Federal Minerals

Production Facility

Existing Road/Gathering Pipeline

ROW Required

Proposed road, pipeline, and

power line


Scenario 3 l.jpg

BLM Surface/Federal Minerals

Existing Road and Gathering Pipeline

Proposed access road, pipeline, & power line

Proposed Well

ROW Required

Scenario 3

ROW required for proposed oil and gas facilities off-lease

Lease A

Lease B

ROW Required


Scenario 4 l.jpg

BLM Surface/Federal Minerals

Unit or Communitization Agreement Boundary

ROW Required

Existing Road

Proposed access road, pipeline, & power line

Proposed Well

Scenario 4

ROW not required for proposed oil and gas facilities crossing multiple-leases within a Unit or Communitization Agreement

Lease A

Lease B

Lease C

Lease D

ROW Required

Lease F

Lease E

Lease G


Scenario 5 l.jpg

BLM Surface/Federal Minerals

Existing Road

Proposed road, pipeline,

& power line

Proposed Well

ROW Required

Scenario 5

ROW required for proposed oil and gas facilities owned by parties other than lessee or operator

ROW Required by Third Party Owner


Operator notification l.jpg

Operator Notification

Notification Opportunities

  • Within 10 days of receipt of APD

  • NOS Option

    • At the On-site

    • 7 days after the onsite

  • Other Notification


Review and approval process l.jpg

Review and Approval Process

  • Include ROW proposal in SUPO

  • Concurrent rather than consecutive review and approval


Forest service l.jpg

Forest Service

Special Use Authorization vs. SUPO

A changing policy


Special use authorizations before the reform act l.jpg

Special Use Authorizations – Before the Reform Act

  • BLM had authority on lease

  • FS had authority off-lease.

  • Two authorizations needed – the APD and a Special Use Permit.


Nfs lands pre reform act l.jpg

FS Special Use Permit

NFS Lands - Pre-Reform Act

BLM approved well and road via APD

Well 14-6

15

14

Lease A

Lease B


Special use authorizations after the reform act l.jpg

Special Use Authorizations – After the Reform Act

  • The FS has authority to regulate all surface disturbance on NFS lands.

  • Order 1 does not dictate when SUA’s are used or limit the extent of SUPO approval


New fs policy for special use authorizations l.jpg

New FS Policy for Special Use Authorizations

Entire access road approved in Surface Use Plan of Operations

Well 14-6

15

14

Lease A

Lease B

No Special Use Permit needed


Policy transition l.jpg

Policy Transition

  • Onshore Order #1 allows for the new policy but FS Regulation and Manual changes are needed to fully implement it.

  • Existing Special Use Permits will be adjusted when due for renewal or when workload allows.


Special use authorization required l.jpg

Special Use Authorization Required

  • Pipelines downstream from meter or custody transfer point

  • Pipelines, roads, utilities located on- or off- lease owned/operated by someone other than leaseholder/operator


Conclusion l.jpg

Conclusion

  • When do I need to apply for a Right-of-Way/Special Use Permit?

  • How will BLM/FS notify me if a Right-of-Way/Special Use Permit is needed?

  • What is the review and approval process associated with a Right-of-Way/Special Use Permit?