ODOT Flexible Funds Program Overview. January 7, 2010. Context. The ODOT Flexible Funds Program is based on direction from the Oregon legislature to invest in non-highway transportation. In May, 2010, the Transportation Commission approved the program.

Download Presentation

ODOT Flexible Funds Program Overview

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.

- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript

Odot flexible funds program overview

ODOT Flexible Funds Program Overview

January 7, 2010



  • The ODOT Flexible Funds Program is based on direction from the Oregon legislature to invest in non-highway transportation.

  • In May, 2010, the Transportation Commission approved the program.

  • Additionally, the Commission directed staff to form a Stakeholder Advisory Committee, to be chaired by Commissioner Mary Olson.

  • The Advisory Committee was tasked with helping the Department develop program criteria.

Program purpose

Program Purpose

  • Support sustainable non-highway projects that positively impact:

    • Modal Connectivity

    • The Environment

    • Mobility and Access

    • Livability

    • Energy Use

    • Overall Operation of the Transportation System.

Key program characteristics

Key Program Characteristics

  • Focus Areas: Transit, Bicycle, Pedestrian, Transportation Demand Management (TDM); related planning, research and project development.

  • Funding: $21 million in FHWA Surface Transportation Funds (STP) were available during the recently completed funding cycle.

  • Eligible Applicants: Government entities eligible to receive STP funds.

  • Project Size: Minimum $50,000 (Federal Share); Maximum $2.1 million (Federal Share).

  • Match Requirement: 10.27% local contribution.



  • In August, the Commission approved criteria recommended to them by the Advisory Committee.

  • An application process for the Flexible Funds Program was initiated by staff in September, 2010.

  • Applications were due to ODOT in November, 2010.

  • 115 requests for funding were received for Transit, Transportation Demand Management (TDM), Bicycle and Pedestrian projects.

Background continued

Background - continued

  • Over $83 million in funding was requested for the $21 million in available federal funds from the Surface Transportation Program.

  • Projects were evaluated by an ODOT Internal Review Committee.

  • Evaluations were based on the criteria developed with the assistance of the Advisory Committee and approved by the Commission.

  • The Transportation Commission will consider the recommended package of projects at their January, 2011 meeting.

Program criteria

Program Criteria

The Criteria focused on several key themes:

  • Connectivity, integration and benefit to the (transportation) system.

  • Sustainability.

  • Mobility, access and health.

Additional considerations

Additional Considerations

  • Applicants were also asked to identify:

    • Project benefits and costs.

    • Timelines.

    • Local support.

    • Planning.

    • Availability of matching funds.

Next steps

Next Steps

  • Reconvene the Flexible Funds Advisory Committee.

  • Assess how well the Program worked during the first application cycle.

  • Identify lessons learned.

  • Update/revise the application process and program criteria as needed.

  • Prepare for the next round of funding, pending direction from the Transportation Commission.



  • Bob Sherman, Sr. Transportation Planner

  • Telephone: 503 986-4226

  • Email:[email protected]

  • Website:

  • http://www.oregon.gov/ODOT/TD/TP/FlexFunds.shtml