Solid Waste Management Facility Permit Modification Request Hubbard Construction Company dba Mid-Florida Materials District 2. June 4, 2013 BCC Public Hearing. Presentation Outline. Communication Request Background Waivers Recommendation. Communication.

Download Presentation

June 4, 2013 BCC Public Hearing

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


June 4 2013 bcc public hearing

Solid Waste Management Facility Permit Modification RequestHubbard Construction Companydba Mid-Florida MaterialsDistrict 2

June 4, 2013

BCC Public Hearing


Presentation outline

Presentation Outline

  • Communication

  • Request

  • Background

  • Waivers

  • Recommendation


Communication

Communication

Prior to this afternoon’s hearing, EPD Staff met with Commissioner Brummer to review the staff report and recommendation that is found in your agenda packet.


Presentation outline1

Presentation Outline

  • Communication

  • Request

  • Background

  • Waivers

  • Recommendation


Request

Request

Applicant requests approval to modify an existing permit for a Construction and Demolition (C&D) Debris Disposal Facility (landfill), to allow vertical expansion and transition to a Class III Landfill.


Presentation outline2

Presentation Outline

  • Communication

  • Request

  • Background

  • Waivers

  • Recommendation


Background

Background

Kelly Park Rd

Parcel IDs:

14-20-27-0000-00-019,

23-20-27-0000-00-035;

Golden Gem Rd

(Future) SR 429

SR 441

Plymouth Sorrento Rd

Ponkan Rd

Haul Routes

SR 441


Background1

Background

Kelly Park Crossing

Existing

Mid-Florida Materials

C&D Debris Landfill

(Future) SR 429

Apopka

Existing

Golden Gem Road Class III Landfill

Golden Gem Rd

Orange County Borrow Pit


Background2

Background

  • Operated as a borrow pit since 1960’s

  • Operated by Hubbard Construction Company as a landfill since mid 1980’s

  • Incoming waste examined by a trained “spotter”

  • Authorized solid waste disposed in excavated pits


Background3

Background

Class III Waste

not restricted to a particular type of source

“not expected to produce leachate which poses a threat to public health or the environment”

includes C&D Debris and similar materials (paper, cardboard, cloth, glass, plastic, furniture, etc.)

includes processed (cut) tires and regulated asbestos

C&D Debris

  • generally from construction or destruction of a structure

  • “generally considered not water soluble and non-hazardous in nature”

  • steel, glass, brick, concrete, roofing, pipe, wallboard, and lumber; also land clearing debris and yard trash


Background4

Background

North 100 acres

Cells 7 - 10

South 120 acres

Cells 3 - 6


Background5

Background

Proposed Class III

Class III above C&D debris in Cells 3-6

soil and top liner final cover

no bottom liner

Class III waste in Cells 7-10

soil and top liner final cover

bottom liner with leachate collection and treatment

Permitted C&D

continue C&D debris in Cells 3-6

  • 2 ft soil final cover

  • no bottom liner

    C&D debris in Cells 7-10

  • 2 ft soil final cover

  • no bottom liner

C&D

Class III

C&D

C&D

C&D

Class III


Background6

Background

Proposed Class III

6” weekly cover soil

~ 40+ groundwater wells monitored semiannually

quarterly odor and methane monitoring

gas vents required for top liner, flares if needed

Permitted C&D

  • no weekly cover

  • ~ 6 groundwater wells monitored semiannually

  • “voluntary” quarterly odor monitoring

  • gas vents and flares only if needed


Background7

Background

Proposed Class III

~ 30 years post-closure maintenance and monitoring

no change

Permitted C&D

  • ~ 5 years post-closure maintenance and monitoring

  • agreement to offer donation of south 120 acres


Presentation outline3

Presentation Outline

  • Communication

  • Request

  • Background

  • Waivers

  • Recommendation


Waivers

Waivers

  • Wekiva Study Area “Presumptive Prohibition”

  • Third-Party Consultant Review of Cell 3-6 Liner Exemption

  • Less than 5 Feet Between Landfill Base and Seasonal High Water Table, Cells 7-10

  • Final Elevations Above Original Grade

  • Reduced Setbacks on Southern and Portion of Western Boundary

  • Reduced Landscape Visual Buffer (Trees)

  • Plans with Grades Depicted at Lines at 2-foot Instead of 1-foot Contour Interval


Waivers1

Waivers

  • Wekiva Study Area “Presumptive Prohibition”

    2004FS 369 Part III – Wekiva Parkway and Protection Act

    • construct Wekiva Parkway

    • protect water resources in Wekiva Study Area (WSA)

  • Comprehensive Plan Amendments for Wekiva

  • Study - Siting Solid Waste Facilities in WSA

  • Chapter 32 Art V amendments

    • “presumptive prohibition” of both C&D and Class III landfills in all but least vulnerable portions of WSA


June 4 2013 bcc public hearing

Wekiva (Floridan) Aquifer Vulnerability Assessment

Wekiva RiverProtection Area

Primary (“more vulnerable”)

Secondary (“vulnerable”)

Tertiary (“less vulnerable”)

Wekiva

StudyArea

The tendency or likelihood for contaminants to reach the top of the Floridan Aquifer System after introduction at land surface.


Waivers2

Waivers

  • Wekiva Study Area “Presumptive Prohibition”

    • current C&D permit is “grandfathered”

    • Class III proposal not “grandfathered”

    • “The proposed Class III design is more protective of the environment and the FAS [Floridan Aquifer System] …” (regardless of underlying geology)

    • in South 120 acres

      • during operational phase with weekly cover

      • once each Cell is capped with top liner

    • in North 100 acres

      • during operational phase with bottom liner

      • once each Cell is capped with top liner


Waivers3

Waivers

  • Third-Party Consultant Review of Cell 3-6 Liner Exemption

    • EPD determines if applicant satisfies liner exemption criteria

    • In making determination, a third-party consultant should be hired to provide a “third opinion” to EPD

    • Applicant requests, “The FDEP’s review of the subject permit application can be considered a 3rd party review.”

      • FDEP liner exemption criteria is the same

      • FDEP approved permit modification in Oct 2012


Waivers4

Waivers

  • Less than 5 Feet Between Landfill Base and Seasonal High Water Table, Cells 7-10

    • Code states, “Alternatives to the five-foot layer may be allowed as a waiver providing that equivalent performance criteria is met.”

    • The proposed bottom geomembrane liner, “… will provide in excess of ‘equivalent’ performance to the impedance of leachate as would have the 5 feet of soil…”


Waivers5

Waivers

  • Final Elevations Above Original Grade

    • BCC waiver is required for filling above natural grade

    • BCC can allow up to 50 feet above grade

    • Historic natural grade varies from 143 ft down to 70 ft (above sea level)

    • Existing site plan

      • peaks at 137 ft (above sea level)

      • has waiver for up to 43 ft above grade at some locations

    • Proposed site plan

      • peaks at 168 ft (above sea level)

      • requests waiver for up to 50 ft above grade at some locations


Waivers6

Waivers

Historic Natural Grade


Waivers7

Waivers

Historic Natural Grade

Excavation Pit

Excavation Pit


Waivers8

Waivers

Max Allowable by Waiver

+ 50 ft

Historic Natural Grade

+ 50 ft


Waivers9

Waivers

Max Allowable by Waiver

Permitted C&D Final Grade


Waivers10

Waivers

Proposed Class III Final Grade

Max Allowable by Waiver


Waivers11

Waivers

PermittedC&D Debris

137 ft peak

120 ft

130 ft

120 ft

70 ft

137 ft

Natural High Point at 143 ft


Waivers12

Waivers

ProposedClass III

168 ft peak

166 ft

168 ft

120 ft

70 ft

145 ft

Natural High Point at 143 ft


Waivers13

Waivers

  • Reduced Setbacks on Southern and Portion of Western Boundary

    • below grade setback is per excavation permit (doesn’t require waiver)

    • above grade setback by code is 150 ft in these areas

    • request to reduce to 50 ft in areas adjacent to:

      • an existing Class III landfill

      • an Orange County borrow pit


Waivers14

Waivers

Above grade starting at 50 ft setback (with Class III starting at 100 ft setback)

Mid-Florida Materials

0

50

100

150

Existing

Golden Gem Road Class III Landfill

C&D

Class III

Orange County Borrow Pit

(slope not to scale)


Waivers15

Waivers

  • Reduced Landscape Visual Buffer (Trees)

    • primarily used as visual buffer with 1 tree / 60 feet

    • request no trees along property boundary shared with another landfill

    • existing waiver (for both landfills)

Property boundary

Mid-Florida Materials


Waivers16

Waivers

Mid-Florida Materials

Areas with reduced landscaping(no trees)

Existing

Golden Gem Road Class III Landfill


Waivers17

Waivers

  • Plans with Grades Depicted at Lines at 2-foot Instead of 1-foot Contour Interval

    • Plan sheets more legible

    • In this instance did not negatively affect ability to review


Presentation outline4

Presentation Outline

  • Communication

  • Request

  • Background

  • Waivers

  • Recommendation


Bcc action requested

BCC Action Requested

APPROVAL OF MODIFICATION OF THE SOLID WASTE MANAGEMENT FACILITY PERMIT #SW-232027-LFCD-85/1212 TO A CLASS III LANDFILL FOR HUBBARD CONSTRUCTION COMPANY, DBA MID-FLORIDA MATERIALS, WITH WAIVERS AND WITH CONDITIONS, FOR THE CURRENT PERMIT DURATION OF DECEMBER 3, 2017.