IFATSEA Assembly

IFATSEA Assembly. Oostende 6th October 2008. We welcome. The move towards more sustainable and more performing aviation The positive initial approach to Safety The confirmation of the “duty of general interest of air navigation services, including public service obligations”

karan
Download Presentation

IFATSEA Assembly

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IFATSEA Assembly Oostende 6th October 2008 François Ballestero, ETF

  2. We welcome • The move towards more sustainable and more performing aviation • The positive initial approach to Safety • The confirmation of the “duty of general interest of air navigation services, including public service obligations” • The confirmation of the “bottom-up approach” for establishing “Functional Airspace Blocks” (FABs)

  3. SES IIMaking best use of SES I Let the ongoing FAB initiatives deliver Need to Focus on : Co-operation as a driver (Co-op Model) Keep States in the loop Consistent involvement of Staff

  4. SES IIPerformance Targets Safety as N°1 objective Capacity Environment Cost efficiency This requires : • A mature safety oversight • A performing CFMU within Eurocontrol • An overall plan for Air Transport where all the stakeholders play an active role • An efficient European cooperation scheme

  5. SES II Maintaining “cost recovery mechanism” at the heart of ATM funding Transparency and costefficiencycanbeachievedwithoutintroducing penalties and limiting cross-subsidies. Services whichdeliversafetyshould not befinanciallyjeopardized.

  6. SES II Keeping CNS inside Air Navigation Services Service Provision Article 18a couldenable the « unbundling » of ATM. For the integrity of the ATM safetychain, we do not support such an objective at the Europeanlevel. CNS : Communications, Navigation and Surveillance

  7. SES IISESAR The ATM master plan : Waiting for a realistic system development Must also answer ATM personnel expectations and include human aspects

  8. SES II Consultation The consultation scope of staff representatives should be as broad as possible. Social dialogue structures, at all levels (company, regional – FAB – national and European), need to be strengthened and consulted formally on every SES domain.

  9. SES II Tasks of National Supervisory Authorities (NSAs) Ensuresufficientresources and skills. Inspections and surveys by NSAsshouldincludechecks on requiredstaffingnumbers

  10. SES II Extension of the licensing scheme Commission proposaldoes not takeintoaccount the humanfactors aspect of ATM. Safetyiscloselyrelated to competence of ATM personnel, hence the necessity of a good and expandedlicensingscheme (at a first step to ATSEPs)

  11. SES II Just Culture Commission proposaldoes not mention « Just Culture » A widerimplementation of Just Culture wouldenhancesafety in Europe.

  12. SES II Network management and design Requiresinvolvement of States Make best use of Eurocontrol expertise Applyframework « bottom-up » approach Betterdefinefunctionsliabilities

  13. Thank You

More Related