1 / 16

Remodelling COMAH \\ Changing the way we regulate major hazards

the Competent Authority. Remodelling COMAH \ Changing the way we regulate major hazards. Sarah Shore Programme Manager. Today’s aims.

kara
Download Presentation

Remodelling COMAH \\ Changing the way we regulate major hazards

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. the Competent Authority Remodelling COMAH\\ Changing the way we regulate major hazards Sarah Shore Programme Manager

  2. Today’s aims \\ Provide you with an understanding of the changes you can expect to see in how the COMAH Competent Authority will operate the COMAH regime from April 2010 onwards.

  3. \\ protecting people and the environment from, and limiting the consequences of, major accidents occurring within the onshore chemical manufacturing and process industries. The Control of Major Accident Hazards Competent Authority

  4. Failure

  5. Objectives Provide an insight into: \\Why the COMAH regime has been reviewed and remodelled \\The remodelled arrangements for the assessment of safety reports \\The relationship between the assessment and inspection processes \\The arrangements and procedures for carrying out inspections on COMAH sites

  6. Objectives (cont.) \\ The new risk ranking and performance rating systems \\ The new model for investigation \\ The new CA Enforcement Policy and procedures \\ How operational intelligence will be used to inform CA intervention strategy

  7. Why Remodelling? \\ COMAH was 10 years old in 2009 – a review is timely \\ The UK has an excellent track record in implementing COMAH but there are areas of concern \\ There are many examples of HSE, EA and SEPA colleagues working well together but… \\ there is scope to manage the functions of the CA more effectively

  8. The changes \\ Management of the CA \\ Intelligence and Risk Ranking/Performance Rating \\ Assessment \\ Inspection \\ Investigation \\ Enforcement

  9. David Jordan Director of Operations Allan Reid Head of Protection and Improvement Intelligence Purpose statement Priorities Plan of work Operation - Policy - Business Reporting outcomes A remodelled Competent Authority Gordon MacDonald Director Hazardous Installations

  10. Remodelled intelligence, risk ranking and performance rating \\inform and direct COMAH policy, priorities and delivery at strategic, operational and tactical levels \\drive performance monitoring, learning, and public assurance \\identify future and developing trends allowing preventative and early interventions \\make the best use of limited resources in focussing on areas of concern and poor performance

  11. Remodelled Assessment \\deliver tighter arrangements for thetiming, pace and conclusionof the assessment process \\rely on an inspection focussed “read through" to identify issues for the first post assessment inspections to verify demonstrations in the safety report \\ rely on inspection to identify specific topics to pursue in subsequent years  \\ improve communications within the regulatory programme

  12. Remodelled Inspection \\increase our capability to compare safety reports against what is happening on the ground \\deliver more specialist resource for site inspection \\place a greater emphasis on multidisciplinary team inspections and less on single topic inspections where appropriate \\provide the ability to deliver cross-cutting programmes of inspection to assess key national topics \\ Result in better targeted, prioritised and leaner intervention plans

  13. Remodelled Investigation \\ ensure early engagement and exchange of information within the CA following an incident \\ introduce a new protocol to assess information and ensure that appropriate CA oversight is put in place \\ introduce a structured approach to the investigation of Major Accidents \\ ensure the early dissemination of information and learning points via Safety Alerts and other means

  14. Remodelled Enforcement \\ There are no fundamental changes to the way we conduct enforcement \\ There are some important changes designed to improve our working within the CA \\ Remodelled enforcement is consistent with HSE, EA and SEPA existing enforcement policies \\ Remodelled enforcement will ensure that regulatory decisions are more consistent, transparent and timely

  15. \\ protecting people and the environment from, and limiting the consequences of, major accidents occurring within the onshore chemical manufacturing and process industries. Our shared aims

  16. Thank you Questions ?

More Related