1 / 14

Preparatory work on JI in Bulgaria

UNFCCC Technical Workshop on Joint Implementation 9 - 10 March 2006, Bonn, Germany. Preparatory work on JI in Bulgaria. Milya Dimitrova Ministry of Environment and Water, Bulgaria. Content. Bulgarian Policy on JI Approved Projects Planned Activities EUETS and JI JISC Key Role

kapila
Download Presentation

Preparatory work on JI in Bulgaria

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UNFCCC Technical Workshop on Joint Implementation9 - 10 March 2006, Bonn, Germany Preparatory work on JI in Bulgaria Milya Dimitrova Ministry of Environment and Water, Bulgaria

  2. Content • Bulgarian Policy on JI • Approved Projects • Planned Activities • EUETS and JI • JISC Key Role • Challenges

  3. Bulgarian policy on JI • Kyoto Protocol Ratification • National Environmental Strategy • Second NAPCC, 2005 – 2008 • JI Sector in MoEW (DFP for JI) • National Procedures • 7 Memoranda of Understanding 13 projects approved

  4. Approved projects

  5. Approved projects

  6. Planned activities • Continuing the Cooperation on JI • Meeting the Eligibility Requirements • Moving to JI Track 1 Procedures

  7. Continuing the Cooperation on JI • 21 Endorsed Project Ideas • MoUs under negotiations – Finland, Spain, Italy, Germany, France • Set aside in NAP

  8. Meeting the eligibility • AAUs Calculation • National System for the estimation of anthropogenic GHG emissions • National Registry • Annual Inventory • AAUs Supplementary Information

  9. Moving to JI Track 1 • Developing National Guidelines • Developing Standardised baselines • Accrediting Local Validators • Developing Additionality Test

  10. EUETS and JI • EUETS limits the scope of JI • Direct Double Counting - cancel allowances from concrete installations • Indirect Double Counting - deduct allowances from electricity sector • Set aside in NAP • Potential for projects outside of the Scheme and non CO2 projects

  11. JISC Key Role • Accreditation of Independent Entities • Criteria for Baseline Setting and Monitoring • Decisions on “Early Movers”

  12. “Early movers” • Revalidation? • PDD Format • Baseline and Monitoring Plan • Methodology • Accreditation of Independent Entities

  13. The challenges … • JISC Decisions • NAP Negotiation and Approval • Meeting Eligibility Requirements • Moving to JI Track 1 Procedures

  14. Milya DimitrovaJoint Implementation SectorClimate Change Policy DepartmentMinistry of Environment and Waterphone: +359 2 940 61 10e-mail: milya@moew.government.bgwww.moew.government.bg

More Related