Update on Experimental Area Organisation Structure. Emmanuel Tsesmelis LEAF 3 March 2006. Introduction. In view of the appointment of four new Technicians (Work-site Management), the the addition of two new Safety Coordinators, and

kane-brock
Download Presentation

Update on Experimental Area Organisation Structure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on Experimental Area Organisation Structure Emmanuel Tsesmelis LEAF 3 March 2006 E. Tsesmelis - TS/LEA

  2. Introduction • In view of • the appointment of four new Technicians (Work-site Management), the • the addition of two new Safety Coordinators, and • the start of a new phase of activities at the experimental areas, the organisation structure supplied by the TS Department to ensure the coordination of the LHC experimental areas has been updated. E. Tsesmelis - TS/LEA

  3. Technicians (Work-site Management) • As work-site supervision technicians for the LHC experimental areas, the four newly-appointed Technicians (Work-site Management) have the following functions: • In the framework of the Experimental Area Teams already in place, actively ensure that working procedures are respected in the experimental areas under the responsibility of TS-LEA, keeping technicians and engineers of the TS-LEA-EAM section well-informed of the application of procedures. E. Tsesmelis - TS/LEA

  4. Updated Organisation Structure *Assistance for USA15 and US15 ** Assistance to ATLAS until milestone of Ready for Lowering CMS Detector E. Tsesmelis - TS/LEA

  5. Update to Point 1 (ATLAS) Experimental Area Organisation • Update has been made to the organisation structure supplied by the TS Department to ensure the coordination of the ATLAS Experimental Area at Point 1 to cover the installation and commissioning of the ATLAS experiment in the underground areas. • The UX15 organisation structure for the installation and commissioning phase of the ATLAS experiment remains unchanged. • The ATLAS Counting Room Management (CRM) organisation structure has been created under the responsibility of the ATLAS Collaboration to provide analysis and follow-up of WPs for USA15 and US15, where commissioning of the experiment electronics is carried-out. E. Tsesmelis - TS/LEA

  6. Global Coordination • - Work Package definition • (budget, scope & schedule) • - All activities outside the Experimental Area • - Detector Installation & commissioning • - Overall schedule Global coordination of the Istallation and comissioning of the Experiment TC Team TC PH HD In situ coordination -TS services & infrastructure - Detector installation & commissioning EAM LEA GL TS HD EAT Update to Point 1 (ATLAS) Experimental Area Organisation PH TS E. Tsesmelis - TS/LEA

  7. ATLAS Technical Coordinator PH Work Package 1 Work Package 2 Work Package n-1 Work Package n Experimental Area Manager TS Transport Coordination Weekly Planning Safety Coordination Transport Contract Update to Point 1 (ATLAS) Experimental Area Organisation E. Tsesmelis - TS/LEA

  8. Update to Point 5 (CMS) Experimental Area Organisation • In view of the start of CMS lowering in to the UXC55 cavern in Summer 2006, the corresponding organisation structure for Point 5 (CMS) is presently under review. E. Tsesmelis - TS/LEA

  9. SXL2 Surface Building at Point 2 • In order to guarantee the safety coordination of the ALICE activities in SXL2, the safety co-ordination of this building has been re-integrated under the responsibility of the TS Department. • The update has resulted in the following: • E. Paulat has been re-appointed Safety Coordinator for SXL2. • P. Ijzermans remains TSO and will continue to lead the organisation of Work Packages and the corresponding Work Package Analysis meetings for SXL2. • Effective as of 1 February 2006 E. Tsesmelis - TS/LEA

  10. Documentation • Updated versions of the relevant documents • EDMS Doc. No. 483480 (Experimental Areas Organisation) • EDMS No. 490701 (List of Buildings and Civil Engineering Infrastructures Included in the Different Experimental Areas) • EDMS Doc. No. 690581 (Update of Organisation Structure for ATLAS Experimental Area) has been released. E. Tsesmelis - TS/LEA