Test monitoring center report to the mack test surveillance panel
Sponsored Links
This presentation is the property of its rightful owner.
1 / 12

Test Monitoring Center Report to the Mack Test Surveillance Panel PowerPoint PPT Presentation


  • 67 Views
  • Uploaded on
  • Presentation posted in: General

Test Monitoring Center Report to the Mack Test Surveillance Panel. October 23, 2003 Paulsboro, NJ. Reference Oil Testing Summary. Test Activity All Mack tests (T-8, T-9, T-10, and T-11) Low Semi-Annual summaries of recent activity are available from the TMC

Download Presentation

Test Monitoring Center Report to the Mack Test Surveillance Panel

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Test Monitoring CenterReport to the Mack Test Surveillance Panel

October 23, 2003

Paulsboro, NJ


Reference Oil Testing Summary

  • Test Activity

    • All Mack tests (T-8, T-9, T-10, and T-11)

      • Low

  • Semi-Annual summaries of recent activity are available from the TMC

    • Please let me know if you would like to be added to the distribution list


T-11 Industry Charts – Soot at 12 cSt


T-11 Industry Charts – MRV


Liner Measurement Round Robin

  • All eight instruments (five labs) successfully calibrated through all three 2003 round robin

  • Fall ’03 round robin is in progress and will complete by end of year


Liner Measurement Round Robin Results


T-10 Intake Manifold Pressure

  • Min, Max, and Average of all tests


T-10 Intake Manifold Pressure

  • Proposed Options

    • 1. Ranged parameter

      • Stage 1: 160 – 200 kPa

      • Stage 2: 210 – 250 kPa

    • 2. Minimum spec

      • Stage 1: 160 kPa

      • Stage 2: 210 kPa

    • 3. No spec


T-11 O & H Issues

  • Intake Manifold Pressure Spec

    • Possibly develop in manner similar to the T-10

      • Submit data to TMC

      • TMC to distribute to group with a proposal

    • Target resolution at December meeting or conference call


T-11 O & H Issues

  • Oil Flush Injection Timing

    • What are labs currently running?

    • Should we specify?


T-11 O & H Issues

  • Humidity Measurements

    • Measurement locations and sensors differ from lab to lab

    • Does it make sense to measure unless it is at the intake manifold?


T-11 O & H Issues

  • Fuel pressure / pressure regulator

    • Pressure of 70 psi nominal (~480 kPa)

    • Regulator: 691GC227M2

    • Should we

      • Include regulator p/n in procedure?

      • Report fuel pressure?

      • If so, should we put a spec on fuel pressure?