Hepn working group goal 8 update grid operations center
This presentation is the property of its rightful owner.
Sponsored Links
1 / 8

HEPN Working Group Goal #8 Update Grid Operations Center PowerPoint PPT Presentation


  • 40 Views
  • Uploaded on
  • Presentation posted in: General

HEPN Working Group Goal #8 Update Grid Operations Center. James Williams Indiana University [email protected] HENP WG Goal #8.

Download Presentation

HEPN Working Group Goal #8 Update Grid Operations Center

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Hepn working group goal 8 update grid operations center

HEPN Working Group Goal #8 UpdateGrid Operations Center

James Williams

Indiana University

[email protected]


Henp wg goal 8

HENP WG Goal #8

  • Work with the network engineering staffs of the US and global research networks to help define the requirements and operational procedures for a Global Grid Operations Center, and mission-specific Grid Operations Centers as needed, so that the ensemble of research networks is able to work efficiently and provide the high level of capability required.

    Perhaps this of needs a bit of revision


Virtual organizations and vo support and the ivdgl

Virtual Organizations and VO Support and the iVDGL

iVDGL is a Virtual Organization

iVDGL supports other VOs (ATLAS, LIGO, SDSS, CMS,…)

VO support is the primary function of the iGOC


Vo support drives all igoc functions

VO Support drives all iGOC functions

Information

who belongs to a VO; how do you participate in a particular VO; what resources are a part of the VO?

Services

Who is my VO RA?; how can I get my VO CA(s)? How do I access VO resources?

Administration

status of my VO job; VO resource tracking/management (change management)


Ivdgl vo support updates

iVDGL VO support updates

iVDGL and iGOC web sites updated – VO information service

TT system in place – VO administrative service

GIIS installed at IU – VO service function

CA/RA function in place – VO administrative function


Ivdgl at sc2002

iVDGL at SC2002

iVDGL demos at the FermiLab and Argonne booths

iGOC/iVDGL demo at the Indiana booth (Research Indiana)

Demo web site at http://www.ivdgl.org/demo/worldgrid/


Working together

Working together

The iVDGL Laboratory Operations WG is anxious to work with other groups struggling with the same sets of issues.

We have Web pages and regular telecons. All are welcome…

Details on the Laboratory Operations page at www.ivdgl.org or contact me.


Questions

Questions??

James Williams

Indiana University

[email protected]


  • Login