1 / 56

Co-PIs: Erol Tutumluer Marshall R. Thompson

Subgrade Soil Support and Stabilization. O’HARE Airport Modernization Research Project. Research Progress Presentation – July 20, 2006. Co-PIs: Erol Tutumluer Marshall R. Thompson RA: H.S. Brar. R 9L-27R. CEAT – OMP Partnership.

kalli
Download Presentation

Co-PIs: Erol Tutumluer Marshall R. Thompson

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Subgrade Soil Support and Stabilization O’HARE Airport Modernization Research Project Research Progress Presentation – July 20, 2006 Co-PIs: Erol Tutumluer Marshall R. Thompson RA: H.S. Brar

  2. R 9L-27R CEAT – OMP Partnership • Research & outreach in support of the development of the O’Hare Airport • The OMP will reconfigure O’Hare’s airfield to a more efficient parallel runway configuration • reduce delays and • increase capacity at O’Hare • $6.6 billion program includes • 35 miles of runways and taxiways, • 2.2 million yd3 of PCC, • 29 million yd3 of earthwork, • 220 miles of storm sewers & underdrains • 650 miles of ductbanks & cabling • Phase I – Construct the new 8th runway: Runway 9L-27R

  3. Introduction • The strength and performance of an airport pavement related to the structural design and the subgrade soil characteristics • This project provides testing and analysis to establish subgrade support and stabilization requirements for O’Hare airport pavements

  4. Introduction (cont’d) • The preliminary concrete pavement design for the Runway 9L-27R: • Design modulus of subgrade reaction, k = 150 pci • 15 – 17 inches of PCC Surface • 6-inch Hot Mix Asphalt Base • 6-inch Asphalt Treated Permeable Base (!?) • “Stabilized” Subgrade Zone (SSZ) • Prepared Subgrade • North Runway (9L-27R, 7,500 ft) paving was scheduled first for the Spring 2006 • Stockpiles of local soil in and around runway & taxiways - Primarily fill and cut areas

  5. Research Objectives • Consider/Establish subgrade support and stabilization requirements with respect to: • Need for subgrade stabilization • Selection of lime and other suitable admixture stabilization considerations • Stabilization depth • Estimate “subgrade support” for various combinations of subgrade stabilization treatments and prepared subgrade conditions

  6. Plate Load Tests Plate load tests conducted (8/04) on R9L-27R subgrade: • Plate 1: 12-inch stabilization/compaction – no admixture • Plate 2: 12-inch quicklime fine (40 lb/yd2) & fly ash (80 lb/yd2) stabilization • Plate 3: 12-inch quicklime fine stabilization (40 lb/yd2)  • Plate 4: 12-inch lime kiln dust stabilization (40 lb/yd2)

  7. Progress Made In 2004-05 • Sampling of the R9L-27R stockpiled soils • Grain size distribution (including hydrometer) • Atterberg limits (LL and PL for PI) • PH value & carbonate content • Selecting & identifying representative soil samples • Characterizing the representative soil samples by conducting tests at the UIUC ATREL for • Moisture-Density-CBR • Resilient Modulus • Unconfined Compressive Strength • Lime Treatment Effectiveness

  8. Progress Made In 2004-05 • June 2005 technical report prepared on the Laboratory Soil Test Program presented preliminary results of the virgin and lime-treated soil testing efforts at ATREL focused on determining moisture-density-CBR relationships, unconfined compressive strengths, and resilient modulus properties • The need for soil stabilization was established from these preliminary test results • A 5 % Lime Kin Dust (LKD) treatment was considered a feasible stabilization choice for increasing the strength/ modulus of the North Runway 9L-27R subgrade soils

  9. Summary of 2004-05 Findings (1) Moisture Density CBR Tests: • Optimum moisture contents of the natural soils were always lower those of the same soils treated with 5% lime kiln dust (LKD) • Similarly, maximum dry densities were always higher for the natural soils without lime treatment • The unsoaked CBR values obtained from testing the compacted specimens tend to drop sharply after the optimum moisture contents for the soils without lime • The treated soils with 5% lime always gave much higher unsoaked CBR values than the natural soils with no lime

  10. Summary of 2004-05 Findings (2) Resilient Modulus (MR) Tests: • MR decreased with increasing applied deviator stresses; typical stress-softening fine grained soil behavior • All soil groups tested at the OMC gave high MR values at 6 psi deviator stress, in the range of Eri = 15-20 ksi Unconfined Compressive Strength Tests: • Large increases in unconfined compressive strengths observed for all groups when 5% lime was added • Lime reactivity (Qu lime treated - Qu natural) is greater than 50 psi for all the groups except for Group 1 • Minimum lime treated Qu = 119 psi was recorded for Group 1 soils with the lowest clay contents & the least reactivity with lime

  11. 2004-05 End of Year 1 Recommendation The results to date indicate that even the 5% high calcium lime kiln dust (BLKD) is adequate and cost effective for improving moisture-density-CBR and cured compressive strengths of the subgrade soils at the new North Runway 9L-27R of O’Hare International Airport. • seems to be working quite well in increasing the soil strengths • the improvements are sufficient to serve as a stabilized subgrade zone and alleviate wet soil conditions

  12. Progress Made In 2005-06 • Conducted additional soil-lime testing in the laboratory for soil samples with different • lime percentages • lime sources • curing times • Established subgrade support for various combinations of subgrade stabilization treatments and prepared subgrade conditions

  13. Admixture Types / Sources • Carmeuse (potential supplier) • South Chicago (dolomitic lime) • Buffington, IN (high calcium lime) • Buffington is the primary source and primarily • worked with in year 1 • Lime types • Lime Kiln Dust (LKD) • Quicklime fines

  14. Group 2 with Different % of LKD

  15. Group 2 with 5 % Lime of Different Types

  16. Groups 2 & 4 with 3 & 7% BLKD

  17. 350 Sample 1 Sample 2 300 Sample 3 250 200 Axial Stress, psi 150 100 50 0 0 1 2 3 4 Axial Strain, % Group 2 with 3% BLKD

  18. Group 4 with 7% BLKD

  19. Group 2 with 5 % Lime of Different Types

  20. Group 2 with 5% SCLKD

  21. Group 2 with 5% BQL

  22. Curing Time Effects Group 1 Soils with 5% BLKD Tested at 120oF

  23. Progress Made In 2004-06 Technical Notes have been prepared and submitted to the OMP throughout the project duration to: • Establish the Best Demonstrated Available Technology (BDAT) for subgrade soil evaluation and stabilization • Communicate specific findings and recommendations to OMP • engineers • TN5: K-150 Considerations for RW 9-27 • TN6: Subgrade Strength/Stiffness Evaluation • TN7: “Working Platform” Requirements for Pavement Construction • TN8: Subgrade Stability Manual (IDOT) • TM13: Moisture Limitations for Lime Stabilization • TN14: Admixture Stabilization (Lime Treatment of Subgrades) • TN19: Progress Report on Laboratory Soil Test Results • (March 2006)

  24. Progress Made In 2005-06 • A project research paper was presented at the 2006 ASCE Airfield and Highway Pavement Specialty Conference, Atlanta, GA, April 30 – May 3, 2006 • Published in the Proceedings bookAirfield and Highway Pavements, edited by I.L. Al-Qadi “Characterizing Subgrade Soils and Establishing Treatment Needs for a New Runway at the Chicago’s O’Hare Airport” by H.S. Brar, E. Tutumluer, M.R. Thompson, L. Gosain, and R. Anderson

  25. Progress Made In 2005-06

  26. Progress Made In 2005-06 • On April 5th, 2006, the Co-PIs joined a teleconference meeting with the OMP concerning the project findings on subgrade stabilization and additional frost action effects • Both North Runway 9L-27R and South Airfield subgrade soil support and stabilization needs were discussed: • effectiveness of lime stabilization on primarily silty soils with low clay contents (less than 20%), • adequate strength gain requirements, • poor workmanship and inadequate construction quality control, • construction cut off dates for lime treatment effectiveness, • frost penetration effects, and • Cement treatment as an option to include in the construction specifications (and use in certain project locations in case lime treatment becomes unsatisfactory for the primarily silty, low clay contents soils to be encountered during subgrade preparation)

  27. Lime Reactivity Issues Lime Source: High Calcium Lime Kiln Dust (LKD) Correspondences with OMP in March 2006 (Larry Martin)

  28. Progress Made In 2005-06 • Based on climatic data from 1997 until 2001, recently acquired and studied at the University of Illinois, Professor Barry Dempsey, an expert on climatic effects at UIUC, indicated that a typical frost penetration depth of 39 inches was predicted for the North Runway 9L-27R pavement designs. • accordingly, frost penetration and related heave should not be a problem for these pavements • Marshall Thompson traveled to the OMP office on April 11th and participated in a conference at ORD with OMP staff concerning • soil stabilization (lime/cement) • frost action effects, and • use of fly ash as a stabilization admixture

  29. FY 07 Year 3 Project Tasks Task 1: Conduct additional soil-lime testing in the laboratory for soil samples with different curing conditions • Temperature conditions to affect curing and strength gain to investigate potential problems if lime stabilization is applied in colder weather ?! • to what extent? • what is the minimum strength? • what is the cut off date?

  30. FY 07 Year 3 Project Tasks Task 2: Cooperate with OMP in the reviewing (and modifying if appropriate) Section P-152 (Excavation and Embankment) and Section P-159 (Lime Modified Soils) • Experiences (problems/successes) from the current 9-27 contract should be considered • The “modified” versions should be included in future contracts

  31. FY 07 Year 3 Project Tasks Task 3: Cooperate with OMP in the reviewing and modifying Section P-158 (Lime Stabilized Subgrade) for inclusion in the upcoming paving contract • Current version cites “latest edition” of IDOT Specs. Should reference the IDOT 2002 version. • Modify Spec. (as needed) to include cement as a possible admixture • Consider frost action and freeze-thaw potentials. Dempsey’s study will provide important inputs. • Will construction be permitted outside the current April 15 – Sept 15 window ? • Other issues??

  32. FY 07 Year 3 Project Tasks Task 4: Evaluate the 9L-27R runway/taxiway soil lime stabilization and modification for meeting the subgrade support (k-value) requirements • The research team will support the activities of OMP in the evaluation ofcompleted lime stabilization • Project Staff will cooperate with the OMP Project – Field Validation of Constructed Subgrade and Pavement Layers in this effort

  33. FY 07 Year 3 Project Tasks Task 5: Evaluate currently available geotechnical/subgrade data for the South airfield of the O’Hare International Airport with particular emphasis on the stockpiled soils • Advise on the soil sampling needs and if considered essential, develop recommendations for additional soil exploration/sampling activities • The need to construct additional subgrade treatment test sections will be considered • Provide non-routine laboratory testing, such as the resilient modulus test, for the soils obtained from drilling and sampling and recommend and conduct (as time and budget permit) a lime-treatment testing program

  34. Project Schedule & Deliverables • Technical Notes will be prepared and submitted to the OMP throughout the duration of this project to communicate specific findings and recommendations to OMP engineers as needed • Several of the Project Tasks are already pursued simultaneously, and the specific delivery of results will be contingent upon availability of OMP data and other factors that depend on coordination with OMP • Continue to work with OMP on current and future subgrade soil support and stabilization needs for all O’Hare runways/taxiways. This will be in the form of sustained support for working with OMP on subgrade soil support issues

  35. Any Questions?

  36. University of Illinois Laboratory Testing Program at ATREL Advanced Transportation Research & Engineering Laboratory (ATREL)

  37. Grouping of Soils at ATREL Grouping done primarily according to % clay content!..

  38. Grouping of Soils at ATREL

  39. Test Specimen Preparation Air Drying Pulverizing Mixing

  40. Moisture- Density- CBR Results CBR (ASTM D1883) Untreated Proctor Compaction (ASTM D698, D1557)

  41. Group 1 Results Lime Source: High Calcium Lime Kiln Dust (LKD)

  42. 60 50 OMC = 16% 40 CBR 30 20 OMC = 14.1% 10 0 10 12 14 16 18 20 22 24 0% Lime 125 5% Lime OMC =14.1% 120 OMC=16% 115 Dry Density (pcf) 110 105 100 95 10 13 16 19 22 25 Moisture Content % Group 2 Results Lime Source: High Calcium Lime Kiln Dust (LKD)

  43. OMC=18.8 % OMC=14.4 % OMC=14.4 % Group 3 Results Lime Source: High Calcium Lime Kiln Dust (LKD)

  44. Group 4 Results Lime Source: High Calcium Lime Kiln Dust (LKD)

  45. Resilient Modulus (MR) Testing sd Unconfined: s3 = 0 2-in. in f MR = resilient modulus = sd / er sd : Deviator stress er : recoverable strain Conditioning:200 load applications at s3 = 0, sd = 41 kPa Testing:100 load applications sd = 14, 28, 41, 55, 69, 83, 96, 110 kPa

  46. MR Tests – Soil Samples Cylindrical specimens, 2 in. f by 4 in. high Undisturbed soil samples – Shelby tube (f = 2.8, 4 in.)

  47. Group 1 MR Test Results LEDFAA (FAA-AC No. 150/5320-6D, 2004) requires MR input Bilinear or Arithmetic Model Eri 15 to 20 ksi

  48. Eri Group 2 MR Test Results Bilinear or Arithmetic Model 15 to 20 ksi

  49. Eri Group 3 MR Test Results Bilinear or Arithmetic Model 15 to 20 ksi

  50. Group 4 MR Test Results Bilinear or Arithmetic Model Eri 15 to 20 ksi