PH-DT-DI 2013/2014 ATLAS activities . TGC gas system. 2013 New recuperation system for n-Pentane: Installation of the module in parallel of the first recuperation Coordination of the safety gas detection

kali
Download Presentation

PH-DT-DI 2013/2014 ATLAS activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PH-DT-DI 2013/2014 ATLAS activities TGC gas system • 2013 New recuperation system for n-Pentane: • Installation of the module in parallelof the first recuperation • Coordination of the safetygasdetection • Test and running for a week (Result at 3500l/h, increase of the recuperation by nearly a factor 2). • Maintenance and modification of the first recuperation: • Dismountling and rebuild of the recuperation as the new one • Installation and test forseen in summer 2014. • Modification of the system to reach the new specification: • New specificationask by the detector team: nominal flow from 2500 l/h to 5000 l/h. (Means new Mixer, new Purifier and new Pump) • Dismountling of the mixer and purifier. • New modules in construction and hopefullyready for summer. • Installation and test forseen in summer 2014. L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI

  2. PH-DT-DI 2013/2014 ATLAS activities RPC gas system • 2013 Modification of the 5 distribution input valve: • The ideawas to reduce the pressure increase at the start-up of the modules. • Leak search on the distribution: • Reduce C2H2F4 consumption and monitor the increase of Oxygeninside the system • Modification of the distribution for detector safety: • Quick connector change at the output of the chambers • Installation of hand valves to open chamber to air during long stop. • Modification of the system to reach the new needs: • Actual flow of 3000 l/h increase to 5000 l/h • Modifiaction of the pump module (passing from 2 pumps to 3 pumps) • Gas line from USA 15 to SGX1 has been double withanother 28mm pipe. • 2014 Modification of the purifier pilot valves and new pressure regulation device: • To improve purifier module and buffer pressure regulation. L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI

  3. PH-DT-DI 2013/2014 ATLAS activities MDT gas system • 2013 Modification of the distribution pilot valves: • During stops somechannel valves stayedopen because of leakinside pilot valve blocks (around 450 pieces in total for all systems). L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI

  4. PH-DT-DI 2013/2014 ATLAS activities TRT gas system • 2013 NEW MIXER WITH ARGON MIXTURE • supply mixture with argon to leakychambers • Recalibration of Mass flow controlers • adaptsome flow to new requests L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI

  5. PH-DT-DI 2013/2014 ATLAS activities LUCID gas system • 2013 LUCID Gas system dismountling : • Dismounting of the 2 distribution racks in the cavern • Dismountingof the Pré-distribution rack in the USA15 L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI

  6. PH-DT-DI 2013/2014 ATLAS activities TFC gas system • 2013 TFC pump maintenance: • Problemwith the new pumpafter 3 months of running. • Restart of the full system Mars 2014 L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI

  7. PH-DT-DI 2013/2014 CMS activities • 2013/2014 Gas systems/Analysis maintenance list: • circulation pumps • safety valves and bubblers • power supplies • profibus quality • pressure regulators • analysis devices • fill TGC with N-Pentane • check/repair heating cables/connectors • calibrations MFC L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI

  8. Conclusions • A lot of activities completed/on-going during 2014 • Many new consolidation projects for all experiments L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI