An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MEG Summary T. Mori for MEG Collaboration February 9, 2005

  2. TheMEG Collaboration • Spokespersons: T.Mori, A.Baldini • Technical Coordinator: S.Ritt • Detectors: • Beam line: PSI P.-R.Kettle • COBRA: KEK/Tokyo W.Ootani • Drift Chamber: PSI J.Egger • Timing Counter: Genova/Pavia/Roma G. Cecchet • Photon Detector: Tokyo/Pisa/KEK S.Mihara • Trigger: Pisa M.Grassi • DAQ/Elec.: PSI S.Ritt • Offline: C.Gatto/S.Yamada/F.Cei

  3. Highlights in developments sine July 2004 Beam line Separator, BTS in construction COBRA Fringing field problem ~solved LXe Beam test w/ new PMTs, waveform digitizers, and wire alpha sources Detector cryostat in construction

  4. Intrinsic from LR analysis target LYSO depth 110 - 64 - 61 = 65 = 56 + 33 psec Absolute time of LXe normal gain high gain 103 psec 110 psec 55 MeV

  5. Background and Sensitivity Jan 2004 Jan 2005 Gamma Energy (%) 4.5-5.0* e+ Timing (nsec) 0.1* Gamma Timing <0.23* ~0.15** Gamma Position (mm) 4.5-9.0* Gamma acceptance >0.4* Muon rate (108/sec) 0.2-0.3 0.25-0.35 Running Time (107sec) 4.0 Accidental Rate (10-14) 2.3-3.5 1.9-3.0 # Accidental Events 0.6 0.6 90% CL Limit (10-13) 1.2-1.7 0.9-1.4 * Measured **w/ new PMTs More detailed calculation necessary

  6. Schedule

  7. Changes (~delays) in schedule Beam line BTS construction LXe Detector cryostat construction PMT delivery new problem arising -- solution foreseen DC Troubles with cathode foil production

  8. Noise from Zener diode

  9. Manpower

  10. Mostly in healthy situation except: beam line + target Monte Carlo

  11. Budget

  12. We now have enough money for PMTs! a new budget for construction in Japan ~400 PMTs additional budget for ~110 PMTs in Italy Then new problems arising… LXe for last 300liters electronics LXe calibration equipment proton beam? PSI

  13. PREVIOUS eg EXPERIMENT 1982 !!

  14. NOW: GLAST SPACE EXPERIMENT CRYSTAL CALORIMETER CALIBRATION 180 cm target-pipe It is the old VDG of the Crystal Ball experiment ! ! they have some problems: old device, max. VDG p-energy is 400 KeV out of resonance: -rate reduced by factor  5000