An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Electric Power Infrastructure:Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis

  2. Owners, Operators, and Users • 2005 Energy Policy Act: • All users, owners, and operators of the bulk-power system shall comply with reliability standards • FERC Rule • All entities subject to the Commission’s reliability jurisdiction… (users, owners, and operators of the bulk-power system) shall comply with applicable Reliability Standards …

  3. U.S. Energy Policy Act of 2005Reliability Legislation • One industry self-regulatory ERO • FERC oversight • Delegates authority to set and enforce mandatory standards to ERO • ERO may delegate authority to regional entities • Standards apply to all users, owners, and operators of bulk power system • Independent governance and compliance program 3

  4. North American Electric Reliability Corporation (NERC) Mission:“To ensure the reliability of the North American bulk power system” • Formed in 1968 • U.S. Electric Reliability Organization • Working to gain similar recognition in Canada

  5. Regional Entities

  6. Electric Reliability Organization Overview Canada NEB, Alberta, British Columbia, Manitoba, Ontario, New Brunswick, Nova Scotia, Quebec, and Saskatchewan United States Federal Energy Regulatory Commission Mexico Comision Reguladora de Energia Reliability Standards Government Oversight Compliance Enforcement Electric Reliability Organization Regional Entities Reliability Assessment Other ERO Members Bulk Power System Owners, Operators, Users

  7. NERC Overview

  8. President & CEO Training, Education & Personnel Certification Standards Compliance & Organization Certification Reliability Assessment & Performance Analysis Legal & Regulatory Finance & Accounting Situation Awareness & Infrastructure Security Information Technology Human Resources NERC Organization

  9. Funding • Funding for ERO and regional delegated functions allocated to load-serving entities • Bulk power system users • Based on Net Energy for Load (NEL) • ERO will fund regions for delegated functions • Penalties offset costs • Funded regardless of penalty collections

  10. …and through the “Virtuous Circle” • Standards • Enforcement • Readiness Program • Situation Awareness • Training • Assessments

  11. Regional Delegation Agreements • Delegated functions • Compliance • Standards • Organization registration • Reliability assessment • Reliability readiness and improvement • Regional consistency is key • Transparency • Predictability • Uniform outcomes

  12. Ensuring Reliability • Standards Development • Compliance • Situation Awareness • Looking Back: Events Analysis • Looking Forward: Emerging Issues

  13. 2007 Emerging Issue Recap

  14. Example of Emerging Issue • Wind Resources Integration • NERC Task Force Status & Recommendations • Background • Changes needed by Planners and Operators • R&D Needs • Way Forward

  15. Projected 2008/09 Winter Wind Projected Winter Wind Projected Winter Wind Total Nameplate Capacity Expected On-Peak Capacity 14,000 14,000 12,000 12,000 10,000 10,000 MW MW 8,000 8,000 6,000 6,000 4,000 4,000 2,000 2,000 0 0 ERCOT ERCOT FRCC FRCC MRO MRO NPCC NPCC RFC RFC SERC SERC SPP SPP WECC WECC Existing Existing Planned Planned Proposed Proposed

  16. Where is Wind Located? • Energy is located remote from demand centers • Unlocking this energy will change: • Planning • Operations Source: EPRI & NREL

  17. IVGTF Preliminary Recommendations R&D Recommendations: • Flexibility • Forecasting • Transmission

  18. What Must Change? Planners: • Consistent methods for energy & capacity • Add Probabilistic Expansion Analysis • Design Flexibility during Resource & Transmission Planning to manage variability and uncertainty • System Design must consider Distributed Variable Resources • Transmission, PHEVs, storage & demand response provide resource flexibility • Standard, generic power flow and stability models required • Reference Manual for Planners needed

  19. What Must Change? Operators: • Forecasting should be incorporated into operations • Larger Balancing Areas impact on Reliability requires Study • Enhanced Standards and Procedures for interconnection are required: • Voltage & Frequency Ride-Through • Reactive & Real Power Control • Frequency & Inertial Response • Operators need to know how to manage added variability and uncertainty • Balancing Areas must have communications to monitor & provide dispatch signals to variable resources • Reference Manual for Operators needed

  20. Preliminary R&D Recommendations R&D Recommendations: • Flexibility • Probabilistic System Planning • Demand Response, Storage and other complementary technologies supporting wind integration • Data requirements for Effective Load Carrying Capability calculations • Balancing Area size & Ancillary Service Requirements • Integrating large amounts of Distributed Generation • Variable Resource Forecasting • Transmission • Interconnection Requirements • Advanced transmission technologies (HVdc, FACTS, etc.)

  21. Detailed Recommendations & Work Plan • Specific Activities Outlined • Three year plan • Suggested Assignments • Reports • Standards Review/Creation • Industry Coordination • Vital next step is the need for an Industry Reference Manual

  22. Emerging Issues • Greenhouse Gas Reductions • Increased Demand-Side & Distributed Generation Resources • Rising Global Demand for Energy & Equipment • Fuel Storage & Transportation 6-10 Years 1-5 Years Mercury Regulation Transmission of the 21st Century Limited Water Availability

  23. Thank you