TRD Status
This presentation is the property of its rightful owner.
Sponsored Links
1 / 15

TRD Status PowerPoint PPT Presentation


  • 101 Views
  • Uploaded on
  • Presentation posted in: General

TRD Status. Kai Schweda, University of Heidelberg. B. Doenigus, J. de Cuveland, T. Dietel, D. Emschermann, M. Kessenbrock, T. Krawutschke, C. Lippmann, J. Mercado, M. Neher, K. Oyama, B. Schockert, M. Schuh, J. Steckert, G. Tsiledakis, R. Wagner, U. Westerhoff.

Download Presentation

TRD Status

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Trd status

TRD Status

Kai Schweda, University of Heidelberg

B. Doenigus, J. de Cuveland, T. Dietel, D. Emschermann, M. Kessenbrock, T. Krawutschke, C. Lippmann,J. Mercado, M. Neher, K. Oyama, B. Schockert, M. Schuh, J. Steckert, G. Tsiledakis, R. Wagner, U. Westerhoff

University of Athens: P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou


Trd status

TRD

3

26

540

12

1

18

6

5

4

9

19

4

12

1

41

540

180

1080

DCS

board

DCS

board

DCS

board

DIMsrv

DIMsrv

DIMsrv

25/01/07

[FSM]

Database(s)

PVSS II

PVSS II

PVSS II

Control room (ACR)

OPCclient

DIMclient

User interface

Ethernet

CR3

CR3

CR3

CR3

CR3

CR3

PVSS II

PVSS II

PVSS II

PVSS II

PVSS II

PVSS II

OPC client

DIMclient

DIMclient

DIMclient

DIMclient

DIMclient

wingDB

ISEG OPCserver

E

E

CR3

CR3

[FED]

[FED]

DIMserver

DIMserver

PCI-CAN

C

E

E

E

DIMclient

DIMclient

ACC

E

E

CR4-Y12

ISEG

UX-I/O/C

netgear switch

UX-I/O/C

netgear switch

E

E

HV

DCS

board

DIMsrv

UX-C

UX-I/O

UX-C

HVD

PCU

GTU

HV

E

E

E

DCS

board

DIMsrv

Pre-trig box

powerdistr. box

Detector

Detector

Detector

Detector

Detector

High Voltage

FEE

HV distribution

Power Control Unit

GTU

Pre-trigger


Trd status

89

1

189

CR3

CR3

CR3

PVSS II

PVSS II

PVSS II

Modbus/TCP

DIP

OPC client

E

Wiener OPCserver

E

[GWG]

E

GasPVSS

UX-A

PLC

[TS/CV]

SG2

TS/CVSCADA

Gas

UX-C

PLC

CR5

CoolingPlant

Gas

UX-I/O/C

Wiener

LV

Detector

Detector

Detector

Low Voltage

Detector Cooling

Gas system


Trd status

Low Voltage(i)

  • Reference panels

  • Power-up sequence for all sub-systems defined

  • Mapping to the TRD Wiener LV PS for SM and DCS power implemented

  • Advantage :

  • More convenient for modifications (Code)

  • Simple alarm handling

  • IP address dependent

  • Flexible for hardware replacements

SM08

D. Emschermann, J. Mercado, G.Tsiledakis


Trd status

Low Voltage(ii)

  • Ready to operate 1st SM in sector 08

  • Additional functions are being implemented in the OPC server, Wiener+JCOP (Supervision control, ramping speed…)

  • Further development is in progress:

    - Access control, local archiving (Georgios Tsiledakis)

    - archiving, DB access, FSM integration (Jorge Marcado)

  • Installation at P2:

  • Ethernet network is completed (Jan 07)

  • IP addresses changed (3rd time), need DHCP (Lennart)

    - Install 45 LV PS (50% of full TRD) in UX25 end of March

D. Emschermann, J. Mercado, G.Tsiledakis


Power control system

UX-C

PCU

dcs

dcs

dcs

dcs

4

18

E

powerdistribution box (PDB)

TRD SuperModule

DCS

board

DIMsrv

Power Control System

  • Power up dcs-boards in SM

  • PVSS control implemented

  • Install 1 PCUs + s/w at CERN this week

  • Need to integrate into FSM

  • Production of 20 pdb (full TRD) and testing at HD

  • Production of 2+2 PCUs

     Next 6 weeks

M. Neher, J. Steckert, J. Mercado


Trd status

High Voltage ISEG

  • datapoint names in OPC and PVSS defined

  • mapping of TRD SMs and stacks in logical view

  • 3 ISEG HV crates w/ 3 CAN buses in star topology

  • Use PCAN-PCI

  • still improving CAN hardware performance

  • BUT: need to fit PCI-cards into PC ! (Peter Chocola)

many thanks to L. Wallet

D. Emschermann, J. Mercado, G.Tsiledakis


Hv distribution box

HV Distribution Box

  • First s/w installed at CERN (Feb 2007)

  • First 5+5 HV cards for 1st SM installed at P2

  • Some heating problems, will fix and check this week

  • 2+2 HV cards from qprint by end of March

  • 40+40 HV cards one week later  power 6 SM

  • Install 4 crates at P2 by end of May (1/3 full TRD)

  • Archiving: oracle DB set up in Athens, need comm. PVSS, recipes

  • Implement into FSM

P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou


Trd status

Cooling

Cooling

  • The (prototype) C&V Framework component is used

  • Cooling has been integrated in LV system

  • The PLC SCY file provided by gas-working group

  • Functionality and understanding of SCY file is in progress…

  • local control through touch panel

  • received IP address of cooling plant

  • testing at CERN (read values)

A. Marin, G. Tsiledakis, A.Tauro, M. Dos Santos, G.De Cataldo


Trd status

TRD Gas System

  • Xenon/CO2 fully operational

  • racks commissioned and run with Argon (minor tests left…)

  • control system in place with PLC and PVSS supervision layer.

  • all interlocks in place

  • software now tuned by gas working group

  • Goofie (drift velocity, gain, gas composition)  via a DIM server to PVSS

  • common effort with the TPC team

G. Tsildeakis, S. Haider, C. Garabatos


Trd fed state diagram

TRD FED State Diagram

GO_STANDBY

OFF

GO_OFF

INITIALIZE (init_tag)

STANDBY

INITIALIZING

STBY_INITIALIZED

TESTING

GO_STANDBY

TEST (test_tag)

CONFIGURE (conf_tag)

CONFIGURING

Implemented on dcs-baord

PVSS: +States OFF & READY

CONFIGURED

GO_CONFIGURED

INITIALIZE (init_tag)

GO_READY

READY

U. Westerhoff, T. Dietel, J. Mercado, K.S.


Fee status

FEE Status

  • chain: PVSS-like  ICL  DB  FEE works

  • implemented FSM on dcs-board (now debugging)

  • all 10168 data-points defined, now being implemented (U. Westerhoff)

  • send std. config., need patches for individual chambers (K. Oyama)

  • all data points and names for offline shuttle defined

  • PVSS-FSM in progress (J. Mercado)

    Open issues:

  • Logging to PVSS (U. Westerhoff, T. Dietel, P. Chocola + NN)

  • install RPM for dim, dns, oracle, interComLayer, ACE, boost, …

  • populate configDB from wingDB in HD (T. Dietel, S. Kapusta)

  • crc32 checksums on TRAP chip


Gtu and pretrigger

GTU and Pretrigger

  • Global Tracking Unit (GTU) J. de Cuveland, M. Schuh

  • Full manual hardware access/configuration

  • PVSSdimserverh/w dummy-chain set up

  • Pretrigger K. Oyama, R. Wagner

    - FSM identical to FED

    - Full manual hardware access/configuration

    - Need to develop PVSS/DB/controlEngine

    - First installation of h/w and/s/w at CERN in April


Fsm status

FSM Status

  • Hierarchy and top-node finalized

  • LV and HV prototypes exist for old modules (e.g., PL500)

    • Currently are being upgraded and improved for final devices

  • FED FSM design started

    • Generic TRD FED device unit

  • Additional sub-systems (e.g., cooling, gas, PCU, GTU, PreTrigger, etc.) implemented as dummy objects

J. Mercado


Interlocks

Interlocks

  • Cooling plant failure

  • Pressure sensors on each SM can generate interlock signal (like TPC)

  •  s/w interlock to ramp down Ramp down all LV PS h/w interlock to shut off power in LV PS (10s delay)

  • Gas failure

  • Expert call, enough time for human response (5h)

  • Cooling failure in LV/HV racks

    Monitor crate temperatures by PVSS  ramp down voltages

    Internal overheat protection  shut off crates