Pixel nsqp update er bundle transmission qualification tests
This presentation is the property of its rightful owner.
Sponsored Links
1 / 5

Pixel nSQP Update ER Bundle transmission qualification tests PowerPoint PPT Presentation


  • 63 Views
  • Uploaded on
  • Presentation posted in: General

Pixel nSQP Update ER Bundle transmission qualification tests. Presented by David Nelson [email protected] nSQP Bundle Test. nSQP Bundle Test. TERMINATION BOARD. PP0 Board. PIGTAILS. INTERFACE BOARD. HSIO. ER CABLE. Single Bundle Test. CK7-NO SHIELD. CK7- SHIELD.

Download Presentation

Pixel nSQP Update ER Bundle transmission qualification tests

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Pixel nsqp update er bundle transmission qualification tests

Pixel nSQPUpdate ER Bundle transmission qualification tests

Presented

by

David Nelson

[email protected]


Nsqp bundle test

nSQP Bundle Test


Nsqp bundle test1

nSQP Bundle Test

TERMINATION BOARD

PP0 Board

PIGTAILS

INTERFACE BOARD

HSIO

ER CABLE


Single bundle test

Single Bundle Test

CK7-NO SHIELD

CK7- SHIELD

DCI7- SHIELD

DCI7-NO SHIELD

DT07-SHIELD

DT07-NO SHIELD


Bundle test status

Bundle test status

  • HSIO Bundle test board fabricated and partially loaded.

    • Need to load 10 each 16 channel LVDS driver chips

    • Need to wire bond more VDCs

    • Need to load DORIC and VDC chips

  • E-board termination fabricated and loaded

  • PP0 board is loaded

  • Pigtail cables are available

  • Need one E-board from CERN

  • Need five ER wire bundles from CERN

  • Need firmware for test.

    • Martin Kocian will modify existing firmware used on the IBL wire bundle tests.