HCAL Upgrade Workshop (SLHC, where nothing is certain)

HCAL Upgrade Workshop (SLHC, where nothing is certain). April 2010 Upgrade Week. Timeline/Milestones. The 2012 and 2015 shutdowns quantize things Will discuss HCAL goals for phase 1 upgrades with these times in mind. Towards 2012. Back-end

joylyn
Download Presentation

HCAL Upgrade Workshop (SLHC, where nothing is certain)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HCAL Upgrade Workshop(SLHC, where nothing is certain) April 2010 Upgrade Week D. Baden

  2. Timeline/Milestones • The 2012 and 2015 shutdowns quantize things • Will discuss HCAL goals for phase 1 upgrades with these times in mind D. Baden

  3. Towards 2012 • Back-end • Plan to have at least 1 fully loaded uTCA crate of production modules ready • Add fiber splitters on some number of data fibers, run VME and uTCA simultaneously • Spend the 2012 year commissioning the system. • Goal: when we begin installing and commissioning FE electronics (2016?), we want to have a solid BE in place • Note: new FE requires new BE • HF • Install new PMTs? Will depend on… • The need. LHC data will tell us much. • The fix. Do we have a good tube candidate, what about neutrons, aging, etc. R&D underway • HO • Install Ring1 and Ring 2 SiPMs • Using current HCAL electronics of course D. Baden

  4. Towards 2015 • Back-end • Complete installation of uTCA • Abandon the VME infrastructure • We hope to be able to do some of this quasi-statically over time in the proceeding run • Front-end • Install and commission with new back-end electronics, HB and HE • Admittedly ambitious but…. • Current HCAL FE was built in 2002. HTRs were built in 2004. • We have built our upgrade project around these timelines. We are guardedly optimistic and appropriately conservative D. Baden

  5. This Week: FE • Series of talks/discussion, focused almost entirely on front-end issues • Back-end, simulation, software discussed elsewhere • Main issues covered: • QIE10 progress • GBT • FE readout module (RM) design • Some discussion of SiPM but not the main topic • Radiation testing D. Baden

  6. QIE10 • Specifications… • Much already understood but much remains • Some significant changes from QIE8 (current version) D. Baden

  7. QIE10 Status • 1st stage in development, FE amp only, study AMS .35mSiGe bi-CMOS process • Submitted 2/22/10, expect test bench measurement in May • Compare to simulation models, if ok then move forward • Rad testing under way • HCAL spec: 1011 n/cm2 for SEU and 5x1012 n/cm2 for bulk damage • Decision taken at 2010 workshop, goal for full chip submission 2/2011 • FNAL engineer Zimmerman, we do not have all of his time unfortunately. And we will need it. D. Baden

  8. GBT Discussion • TullioGrassi presented our requirements to Magnus and P. Moreira • 160MHz DDR serial input to GBT • 8B/10B data transmission protocol • P. Moreira provided much information, long discussion of GBT capabilities, possibilities, and HCAL needs • GBT plan to have a “complete” prototype in 2010, followed by extensive testing with a production version 2nd half of 2011 • We have much homework to refine our specifications • GBT may also give us a real path towards a more redundant slow controls • If GBT project can meet our needs then we can commit to being a customer • We are concerned about the schedule. They are losing 2 or 3 key people. • Overall this was a very possible discussion. We are optimistic. D. Baden

  9. FE readout module (RM) • Tullio presented our power/cooling requirements and options • Design to 200W/RBX >> current usage 90W • Need a scheme for delivering more power, but cooling is adequate • We want to try to use the Cern MIC DC-DC converter (discussion…) • Chris Tully led a long discussion on the R&D issues • Many issues. Too many for here. • Much dependence of electronics integration with SiPM vendor • Whether we have an “EDU” or an “ODU”, sorry for the jargon • ADC cards are very ambitious, lots of pins. • Much prototyping now Optical Interface Structure FPGA/GBT emulator and transmitter Zecotek “EDU” D. Baden

  10. RM Integration • Development of the RM is largely driven at this stage by component development • SiPM • GBT (and GBT SCA) • QIE10 • LV regulators • It’s important to guide the parameters of these components as they are being developed D. Baden

  11. Front-End R&D, near term • SiPM. R&D towards choosing a vendor • Have a specific R&D with Zecotek (high density) to reduce the response time and characterize lifetime and radiation response • This is our “EDU” • Have a specific R&D to use large area SiPMs (lower pixels but very fast recovery times, adequate for HCAL) • This is more like an ODU and opens up the vendor pool • RM R&D • Work with GBT group • Specify QIE10 inputs and outputs, and functionality in concert with GBT and overall RM design Depth 4 Depth 3 Depth 2 Depth 1 (Layer-0) D. Baden

  12. Summary of Issues/Requirements(Always Evolving) Baden