OR 42: County Line Curves Environmental Assessment Purpose and Need February 17, 2009 PowerPoint PPT Presentation


  • 36 Views
  • Uploaded on
  • Presentation posted in: General

OR 42: County Line Curves Environmental Assessment Purpose and Need February 17, 2009. Purpose. The purpose of the project is to cost effectively address safety issues in the OR 42 corridor between mile posts 41.0 and 46.0. Need.

Download Presentation

OR 42: County Line Curves Environmental Assessment Purpose and Need February 17, 2009

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


OR 42: County Line CurvesEnvironmental AssessmentPurpose and NeedFebruary 17, 2009


Purpose

The purpose of the project is to cost effectively address safety issues in the OR 42 corridor between mile posts 41.0 and 46.0


Need

  • Crash rate is three times higher than state average for Rural Principal Arterial

  • Two Safety Priority Index System (SPIS) sites – east end of project:

    • Mile Post 45.02 to 45.19

    • Mile Post 45.75 to 45.85

  • Three fatal crashes (2004-2006)


Need

  • Safety Investment Program (SIP) sites:

    • Mile Post 41.0 to 45.0 = Category Two

    • Mile Post 45.0 to 46.0 = Category Three

    • Category Three, Four, or Five are prioritiesfor safety improvement funding


Total Crashes By Mile Post


Crash Rate By Mile Post


Crash History (2004-06)


Need

  • Roadway geometry does not meet current design standards

  • At least 21 curves exceed the maximum degree of curvature for Rural Principal Arterial


Existing Conditions


Goals

  • Improve safety in the corridor for all users

  • Develop cost-effective solutions

  • Improve traffic flow (mobility) through the project area

  • Minimize impacts to environmental resources


Improve safety in the corridor for all users

  • Remove substandard curves and roadway geometry

  • Improve sight distance

  • Increase shoulder width

  • Mitigate geohazards (rock fall and slides)


Develop cost-effective solutions

  • Accommodate phased construction as funds are made available over time

  • Make use of the existing road and facilities where feasible


Improve traffic flow (mobility) through the project area

  • Meet design standards

  • Meet projected travel demands for the vehicle types using the corridor for at least twenty years into the future

  • Reduce the number of locations with advisory speeds lower than the design speed


Improve traffic flow (mobility) through the project area

  • Maintain access to adjacent properties

  • Provide passing opportunities

  • Minimize travel delays and detours during construction


Minimize impacts to environmental resources

  • Avoid or minimize potential impacts to unstable slopes that increase the potential for slides

  • Avoid or minimize impacts to native species and their habitats including those listed or proposed for listing under the Endangered Species Act


Minimize impacts to environmental resources

  • Avoid or minimize impacts to aquatic resources--which include the Middle Fork Coquille River, its floodplain and tributaries, and freshwater wetlands

  • Provide stormwater treatment and control


Minimize impacts to environmental resources

  • Minimize impacts to mature riparian vegetation

  • Avoid impacts to archaeological, historic, and cultural resources


All Options