An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Access to Bandwidth: Proposals for Action Ilsa Godlovitch Regulatory Policy Directorate igodlovitch@oftel.gov.uk

  2. Access to Bandwidth • OFTEL Consultative Document (Dec 98) • “Access to bandwidth - Bringing higher bandwidth services to the consumer” • Focused on access to higher bandwidth using DSL technology over BT’s local loop

  3. Key questions • Is there demand from residential consumers and SMEs that is not being met? • Are there barriers preventing operators and service providers from accessing these consumers? • If so, how can this be resolved? 5 options set out… not mutually exclusive

  4. Results of consultation • Over 60 responses from a wide variety of bodies • Preliminary conclusions: • Residential sector has promise of future effective demand, but faces ‘chicken & egg’ situation at present • Unmet effective demand in the SME sector and from SPs and operators • SPs and operators face barriers to providing services

  5. Options for action • Customers need access to services, not access options • Service Providers prefer wide accessibility as delivered by Option 4 • Operators preferred more control over service delivery and timing, as in Option 2 • Options 1, 3 and 5 received less support, though Option 5 is long term goal

  6. Option 2: Partial Baseband Leased Circuit Layer 1 Analogue Access NTP Customer Site BT Local Concentrator Building OLO providedequipment OLO collocated equipment MDF NTP/POI BT Partial Baseband Leased Circuit

  7. Option 2 - pros and cons • Pros • Competing choices of higher bandwidth access and more innovation in services • Each operator can take its own risk and investment decisions independently of BT • Cons • Unlikely to deliver to the ‘mass market’ • Technical and operational issues • Provision of telephony

  8. Option 4: Permanent Virtual Circuit Access Layer 3 Access ATM switch or IP router providing Permanent Virtual Circuit connection to OLO or SP NTP BT Local Concentrator ATM or IP OLO or SP DSL modem DSLAM NTP/POI DSL Access Multiplexer

  9. Option 4 - pros • Substantial proportion of UK could be covered quite quickly • Thus attractive to many Service Providers • Minimises technical and operational problems • Customers can retain BT as telephone supplier

  10. Option 4 - cons • If pace and extent left to BT: • Some effective demand my remain unmet for some time • No competition in the network upgrade • Choice of technology in the hands of BT • If OFTEL to determine extent of roll-out • OFTEL would have to substitute its assessment of economic viability for BT’s • Highly unattractive

  11. OFTEL’s conclusions on consultative responses • The pros and cons of Options 2 and 4 tend to balance each other • Need to get the best of both • Stimulate competition in both Service Providers and Operator markets • Differing needs of residential and SME could be met

  12. Next steps • BT has announced service provider products for ADSL (similar to option 4) • BT liaising with OFTEL’s compliance directorate • Awaiting consultation responses on unbundling proposals • And progressing work on Option 2

  13. Consultation • How many will take up option 2 • What is likely utilisation and where are likely target areas • Pricing proposals • Views on local loop pricing principles • Co-location pricing • View on providing telephony • Feasibility of splitting the loop

  14. Option 2 work plan • The NICC DSL TG has been asked to continue work to produce: • Spectral Management Plan to support Option 2 • Deployment rules to minimise interference • Focus Group of OPF LLU FG has been established to develop guidelines for the provision of: • Co-location facilities • Operational processes for loops

  15. Key milestones • By Oct 99 - Groups scope tasks and terms of reference • By June 2000 - OPF LLU FG and NICC DSL TG complete work and publish conclusions • By Jan 2001 - Collect orders and set up trial • Service starts by 1st July 2001

  16. Your participation • Welcome participation in industry groups to help resolve technical & operational issues • Responses to the consultation invited by 30 Sept. Statement to be published end of Oct.