1 / 11

Effects of Lowest Price-Technically Acceptable (LPTA) Contracting On Laboratory Data Quality Authors Jamie Fox, Paul Wi

Effects of Lowest Price-Technically Acceptable (LPTA) Contracting On Laboratory Data Quality Authors Jamie Fox, Paul Winkler, Ph.D., Mark Minteer . www.aqainc.net. Two Contracting Approaches Best value Scoring approach to proposals

joie
Download Presentation

Effects of Lowest Price-Technically Acceptable (LPTA) Contracting On Laboratory Data Quality Authors Jamie Fox, Paul Wi

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Effects of Lowest Price-Technically Acceptable (LPTA) Contracting On Laboratory Data Quality Authors Jamie Fox, Paul Winkler, Ph.D., Mark Minteer www.aqainc.net

  2. Two Contracting Approaches • Best value • Scoring approach to proposals • Technical proposals are scored rather than simply pass/fail • Technically excellent laboratories have a distinct advantage • Technical score and price score are normalized and combined to reach a final score • It takes money to support a rock-solid QA infrastructure Your Environmental Data Quality Experts

  3. Two Contracting Approaches • LPTA • Bidding laboratories have to show minimum technical acceptability • All passing laboratories – those that can get over the bar of minimum acceptability - are dropped into the “acceptable” pool and then lowest price wins • There can be a large difference between laboratories that merely squeak over the bar and those that fly over it Your Environmental Data Quality Experts

  4. If you operate in a low-bid environment, you must maintain the ability to analyze samples. • Where do you cut costs? • QA infrastructure • IT infrastructure • Data reporting • Project management • Eliminate sample re-analyses for quality problems • Salary reductions which result in loss of talent Pay Now or Pay Later Your Environmental Data Quality Experts

  5. Effects of LPTA on Laboratory Operations • You are not the lowest bidder, you lose! • Increased laboratory burden • Decreased per sample price / increased number of samples to generate same revenue • Analytical shortcuts • Decreased quality assurance oversight • Deliverable corrections and CAR responses incomplete and/or not delivered in a timely manner Your Environmental Data Quality Experts

  6. LPTA Raising The Bar • Laboratory scope and capacity • Proper equipment • Qualified personnel • Quality systems • Reporting capability Your Environmental Data Quality Experts

  7. What Factors Should Be Considered For Technical Acceptability? • Instrument capacity / quality / maintenance practices • Comprehensive and compliant SOPs • Adherence to SOPs • Sophisticated NCM process • Qualified chemists • On-time performance • Lab responsiveness • Performance of QC samples • PE performance • Past audits • Lab certifications • Login, tracking, LIMS sophistication • Triggers for proper extract cleanup Your Environmental Data Quality Experts

  8. Review of Technical Acceptability • Assessment of technical acceptability must be done rigorously by qualified analytical chemists who can assess all criteria just mentioned • Must be able to use historical information to determine validity of claims • Information supplied by laboratories must be verifiably comprehensive and accurate • Laboratory assertions are often misleading at best Your Environmental Data Quality Experts

  9. Consequences of Inadequate Verification • Acquisition of indefensible data • Misleading data such as false positives or false negatives • Diminished quality (excessive qualification) • Contracts awarded to laboratories that do not have sufficient capacity to generate compliant data on-time Your Environmental Data Quality Experts

  10. Summary Best value gives you the best product for your dollar Current approach to LPTA contracting commonly forces a decrease in laboratory data quality Need to raise the bar to meet your project requirements Rigorous technical acceptability verification is a must Your Environmental Data Quality Experts

  11. Contact Us Paul Winkler, Ph.D. Senior Scientist pwinkler@aqainc.net Cell: (303) 882-0792 Mark Minteer President minteer@aol.com Office: (505) 299-5201 Headquarters: Albuquerque, NM Phone: (888) 678-5447 http://www.aqainc.net Other Locations: Colorado, Nevada, & South Carolina Jamie Fox Chemist jfox@aqainc.net Cell: (505) 307-3770 Your Environmental Data Quality Experts

More Related