slide1
Download
Skip this Video
Download Presentation
City of n Tigard

Loading in 2 Seconds...

play fullscreen
1 / 9

City of n Tigard - PowerPoint PPT Presentation


  • 122 Views
  • Uploaded on

City of n Tigard. Respect and Care | Do the Right Thing | Get it Done. Active Capital Construction Projects. Presented to Tigard City Council March 22, 2011. Pacific Hwy/Greenburg Rd/Main St Intersection Improvements. Respect and Care | Do the Right Thing | Get it Done. Pre-construction.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' City of n Tigard' - joel-holden


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

City

ofn

Tigard

Respect and Care | Do the Right Thing | Get it Done

Active Capital Construction Projects

Presented to Tigard City Council

March 22, 2011

slide2

Pacific Hwy/Greenburg Rd/Main St Intersection Improvements

Respect and Care | Do the Right Thing | Get it Done

  • Pre-construction
slide4

550-foot Zone Improvements

  • 10-million gallon Transfer Pump Station
  • Piping installation connecting the reservoir to the pump station
slide5

550-foot Zone Improvements

  • 10-million gallon Transfer Pump Station
  • Forming, installing rebar, and adding conduit for the pump station
slide6

550-foot Zone Improvements

  • 10-million gallon Transfer Pump Station
  • Pouring the top of the pump station building
slide7

550-foot Zone Improvements

  • 10-million gallon Transfer Pump Station
  • Finished concrete surface top of the pump station building
slide8

550-foot Zone Improvements

  • 10-million gallon Transfer Pump Station
  • Painting the inside of the reservoir
slide9

550-foot Zone Improvements

  • 10-million gallon Transfer Pump Station
  • Building the footing for the architectural screen wall along Bull Mountain Road