1 / 18

GLAST Large Area Telescope Instrument Operations

This document outlines the requirements and specifications for the operation, maintenance, and performance of the GLAST Large Area Telescope (LAT) instrument. It covers commanding, flight software, simulator, data processing, event reconstruction, analysis software, interfaces, data standards, and overall system reliability.

jlindner
Download Presentation

GLAST Large Area Telescope Instrument Operations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Instrument Science Operations CenterCDR Section 2 Requirements Jim Martin SLAC jfm@slac.stanford.edu 650-926-4895

  2. LAT Specification Tree LAT LEVEL I II III 55 Level II Requirements 379 Level III Requirements

  3. Level II Requirements

  4. Driving Requirements • 4.3.7 - LAT Instrument Commanding • Generate LAT instrument commands and identify procedures to direct the safe upload of the commands. • 4.3.9 - LAT Instrument Flight Software • Maintain, update, and validate the operation and performance of the LAT flight software. • 4.3.10 - LAT Instrument Simulator • Maintain an instrument simulator for validating and verifying changes to flight software and command procedures, and also for use in anomaly resolution. • 4.4.1 - Level 0 Data Processing • Receive Level 0 data from the MOC post-pass and process the data into Level 1 event data within 24 hours of receipt from the MOC. • 4.4.2 - Real-time Housekeeping Data • Autonomously receive real-time housekeeping data in near real-time from the MOC and process the data for diagnostic use. • 4.4.6 - Instrument Response Simulation • Develop and maintain software to simulate the detailed response of the LAT to charged particles and gamma rays. • 4.4.5 - Event Reconstruction and Classification • Develop algorithms to interpret the subsystem responses, apply calibration constants, and to find and identify incident photons.

  5. REQUIREMENTS – Level II – LAT-SS-00015 Science Operations

  6. REQUIREMENTS – Level II – LAT-SS-00015 Instrument Operations – 1/3

  7. REQUIREMENTS – Level II – LAT-SS-00015 Instrument Operations – 2/3

  8. REQUIREMENTS – Level II – LAT-SS-00015 Instrument Operations – 3/3

  9. REQUIREMENTS – Level II – LAT-SS-00015 Analysis Software and Data Processing – 1/3

  10. REQUIREMENTS – Level II – LAT-SS-00015 Analysis Software and Data Processing – 2/3

  11. REQUIREMENTS – Level II – LAT-SS-00015 Analysis Software and Data Processing – 3/3

  12. REQUIREMENTS – Level II – LAT-SS-00015 Interfaces

  13. REQUIREMENTS – Level II – LAT-SS-00015 Data and Data Format Standards

  14. REQUIREMENTS – Level II – LAT-SS-00015 Availability, Reliability, Automation, Security

  15. REQUIREMENTS – Level III – LAT-SS-00021

  16. REQUIREMENTS – Level III – LAT-SS-00021 Continued – 2/3

  17. REQUIREMENTS – Level III – LAT-SS-00021 Continued – 3/3

  18. Summary • Requirements are in the signature cycle • Review and update as needed after GSDR • Development approach tailored to Level III • Ready to develop

More Related