All Experimenters’ Meeting. November 11, 2013. Accelerator Operation Summary. From : November 4, 2013 (0000 hours) To: November 11, 2013 (0000 hours). Calendar Week # 45 NuMI Weekly Integrated Intensity 5.84 E18 protons

jillian-fry
Download Presentation

All Experimenters’ Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. All Experimenters’ Meeting November 11, 2013

  2. Accelerator Operation Summary From : November 4, 2013 (0000 hours) To: November 11, 2013 (0000 hours) Calendar Week # 45 NuMI Weekly Integrated Intensity 5.84 E18 protons BNB Weekly Integrated Intensity 5.33 E18 protons NMuonWeekly Integrated Intensity 1.67 E14 protons MTest Weekly Integrated Intensity 1.61 E14 protons Beam Hours To NuMI121.6 hours Beam Hours To BNB124.4hours Beam Hours To NMuon 54.0 hours Beam Hours To MTest 58.5hours

  3. Status /Work Completed/Plans • Proton Source • Tuning and Maintenance • Swapped sources • Main Injector • Access for Recycler restriction • Tuning and Maintenance • Recycler • Beam pipe alignment @ 215 & looked in beampipe at 308/309 • Found alphasorb in 308 location • Recycler RF used to capture beam • Beginning commissioning • BNB • Tuning • Horn off/Beam off target mode • MiniBooNE starts taking beam • NuMI • Tuning

  4. Status /Work Completed/Plans • Switchyard • Tuned extraction and beamline • Foil calibration • Setup slit to NMuon • MTest • Foil Calibration • Tuning • NMuon • Vacuum work and tunnel cleanup complete • Startup sheet, Beam Permit and Running Conditions signed • NMuon startup on Friday • NM1 Box SWIC problem • SWIC partially in the beam • No spare SWIC of this type • SWIC being removed today

  5. Schedules and Links: • Schedule can be accessed from the Operations Home Page • - Schedules -> Operations Schedule • Direct link to schedule • - http://www-ad.fnal.gov/ops/schedule.html