Manufacturing & Quality Improvement Action Plan

Manufacturing & Quality Improvement Action Plan. Date: 13Dec05. Manufacturing & Quality Control Issues. Balance shaft taper inspection results Attachment 1.1. 1.386. 1.517. Balance shaft Cylindricity inspection results Attachment 1.2. Cpk:1.54. Cpk:1.43. 1.386.

Download Presentation

Manufacturing & Quality Improvement Action Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Manufacturing &Quality Improvement Action Plan Date: 13Dec05

  2. Manufacturing & Quality Control Issues

  3. Balance shaft taper inspection results Attachment 1.1 1.386 1.517

  4. Balance shaft Cylindricity inspection resultsAttachment 1.2 Cpk:1.54 Cpk:1.43 1.386 1.517 Based on Specification of 0.005 Cylindricity

  5. BS Housing Bore Inspection results Attachment 2 1.386 1.517 Data Collection:Dec.05.05~Dec.10.05

  6. BSM Balance shaft bearing Attachment 3.1 Bearing crush height Capability Study 0.070 0.054 1.517

  7. BSM Balance shaft bearing Attachment 3.2 ●Measuring Machine – Crush Height Crush Height Value Display Load Value Display 1.386 1.517 Measuring Machine Picture Data Display Measuring Block

  8. BSM Balance shaft bearing Attachment 3.3 ●GAGE R&R 1.386 1.517

  9. Supplier Process Audit Schedule Attachment 4.1