An In-depth Look at a Green Roof. Jon Burke 2006 Mechanical Faculty Consultant: Dr. Jelena Srebric. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric. Outline. Building Information Purpose Procedure Results First Cost Analysis Lifetime Analysis Additional Benefits

jill
Download Presentation

Jon Burke 2006 Mechanical Faculty Consultant: Dr. Jelena Srebric

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. An In-depth Look at a Green Roof Jon Burke 2006 Mechanical Faculty Consultant: Dr. Jelena Srebric

  2. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Outline • Building Information • Purpose • Procedure • Results • First Cost Analysis • Lifetime Analysis • Additional Benefits • Conclusions

  3. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Existing Conditions Rendering supplied by Kling Central Shared Use Facility FDA’s White Oaks Campus Silver Spring Maryland Design Firm: Kling Civil Firm: Greenhorne & O’mara Owner: GSA

  4. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Existing Conditions Rendering supplied by Kling 3rd Floor – Library 26,500 sq ft. VAV System Cold and Hot water pumped from Central Plant on Campus

  5. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Existing Conditions

  6. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Purpose How does size affect project costs and benefits? GOAL: Find “Benefit”/sf and optimal size • First Cost Analysis • Material and Labor • Rainwater Quality • Structural Support • Lifetime Analysis • Energy Savings • Maintenance Costs • Other Benefits • LEED Rating • Architectural Value

  7. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Procedure

  8. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Procedure

  9. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Procedure

  10. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Procedure

  11. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Procedure

  12. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Procedure

  13. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Procedure

  14. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Procedure

  15. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Results – First Costs Materials and Labor Built-up Flat Roof: $2/sf Green Roof: $14/sf COST $12/sf Green Roof

  16. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Results – First Costs Rainwater Runoff Quality Greenhorne & O’mara SAVE 69¢/sf of Green Roof Runoff of Green Roof is Clean Bio-Retention System 1 I.A. = 3000 sf Filter $10 /sf of Filter

  17. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Results – First Costs Structural Support for 50 psf 30” Diameter ($1,992)  14” Diameter ($875) 24” x 24” ($3,203)  12” x 12” ($1,252) COST $2.50/sf Green Roof

  18. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Results – First Costs Total First Costs Materials and Labor: $12/sf Structural Impact: $2.50/sf Filter System: -$0.69/sf Total: $13.80 Additional Cost per Square Foot of Green Roof

  19. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Results – Annual Costs Energy Savings • Peak Cooling Load Reduction • 0.6 tons/265 sf Green Roof • Annual Electric Load Reduction • 2.15 kWh/sf Green Roof GSA: 10¢/kWh SAVE 21¢/sf Green Roof PER YEAR

  20. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Results – Annual Costs Maintenance Costs Built-up Flat Roof Green Roof Annual Maintenance Lifetime: 15 yrs Negligible Maintenance Lifetime: ?? Greening Rooftops for Sustainable Communities. Chicago 2003. Page 280

  21. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Results – Other Benefits LEED Rating • Guaranteed • Credit 6.1: Stormwater Management – 1 point • Credit 7.2: Heat Island Effect – 1 point Architectural Value

  22. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Conclusion “Energy conservation is the foundation of energy independence.” ~Thomas H. Allen (D-ME 1st)

  23. Jon Burke 2006 Mechanical Option Consultant: Dr. Jelena Srebric Conclusion Any Questions?