Final Presentation Feasibility study for U-Drive Presentation of project Presented by: Emma Heaney

Final Presentation Feasibility study for U-Drive Presentation of project Presented by: Emma Heaney Martin Lake Joe Powell Luke Warren. Overview.

Download Presentation

Final Presentation Feasibility study for U-Drive Presentation of project Presented by: Emma Heaney

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Final Presentation Feasibility study for U-Drive Presentation of project Presented by: Emma Heaney Martin Lake Joe Powell Luke Warren

  2. Overview • A local based driving school, known as U-Drive School of Motoring is looking to expand it’s current home based office of 2 employees. CEO Colin Powell and his wife to a new office with approximately 30 office staff. • The new office building requires a brand new computer network and has asked us to carry out a feasibility study on different solutions to their problem.

  3. The Client • U-Drive is a locally based driving school • Based within the Highcliffe area in Dorset • Founded and run by CEO Colin Powell • Is primarily home based but looking to expand

  4. The Project • Our project is to conduct a feasibility study for U-Drive to create a system that will be used with the new expansion of the business • Deliverables will include: • Working Prototype of System • Floor plan listing devices • 3 Different cost plans of various brands • Report with complete details of the process • Newly designed Website (requirement removed)

  5. Methodology • Idea is based on the Waterfall model

  6. Methodology • Starting with the requirements set in the Terms of Reference. • Following on to the design phase. • Designing the Floor Plan • Designing Logical Topology • Designing Addressing Scheme, VLANs (Virtual Local Area Network) etc.

  7. Methodology • Following on to device requirements: • Servers, switches, routers • Equipment brands e.g. Cisco, Procurve • Operating Systems e.g. Windows 7 • Email clients e.g. Google Mail

  8. Methodology • Finishing with maintenance: • Network Management • Redundancy • Backups and Repairs • Possible Future Growth

  9. Terms of Reference • Terms of reference outlined main requirements of the client: • Background • Objective • Scope • Constraints • Assumptions • Deliverables

  10. Research • Wired • More secure (no publicly available access) • Faster speeds of 100Mbps+ • More reliable connection • Cheaper • Manageable from central point

  11. Research • Wireless • Mac address filtering available • Speeds of upto 54Mbps (Based on 802.11g) • Different encryption methods • Expensive with manageable access points (VLANs) • Susceptible to interference • Vulnerable to attack • Verdict: Wired Network

  12. Research • Desktop Operating Systems • Windows 7 • Windows XP • Linux • Verdict: Windows 7

  13. Research • Server Operating Systems • Windows Server 2008 • Linux (Centos) • Verdict: Windows Server 2008

  14. Research • Office Suites • Microsoft Office 2010 • OpenOffice • Verdict: Microsoft Office 2010

  15. Research • Internet Packages • BT Business Broadband • Zen Pro Business Broadband • Zen Office Unlimited Broadband • Gravity Internet ADSL2+ • Verdict: BT Business Broadband

  16. Research • Mobile Packages • Vodafone ‘My SIM’ • O2 SIM Only Deal • Orange2Business • Verdict: Vodafone ‘My SIM’

  17. Design Process (VLANs) • The following VLAN assignment has been created for the network:

  18. Logical Topology

  19. Cost Plan • Decided on devices for 3 cost plans: • (Top) Cisco Layer 3 • (Mid) Cisco Layer 2 • (Bottom) Linksys

  20. Cost Plan • After producing three cost plans the costing’s were: • Top £16,672 (w/ ex £57,303) • Mid £8,510 (w/ ex £36,063) • Bottom £7,425 (w/ ex £27,138)

  21. Visio • Visio designs, Comms Room

  22. Visio • Visio designs, overall office

  23. GANTT Chart • Version 21 of the GANTT Chart:

  24. Summary • Topology – Completed • Prototype - Completed • Floor Plans – Completed • Cost Plans – All 3 Completed • Website – Agreed to be cancelled with client • Report - Completed

  25. Questions? If you have a question feel free to ask now.