html5-img
1 / 1

Roundabouts at Three Intersections August, 2012

Roundabouts at Three Intersections August, 2012. ENGINEERING DEPARTMENT.

jennis
Download Presentation

Roundabouts at Three Intersections August, 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Roundabouts at Three IntersectionsAugust, 2012 ENGINEERING DEPARTMENT General Project Description: Design three Roundabouts at (Edgemere & RC Poe, Edgemere & Rich Beem and Montwood & Sun Fire) and one Traffic Signal at Dyer & Angora Loop, improvements to include concrete sidewalks / ADA Ramps, landscaping, irrigation system and illumination. Project Schedule: Design Start: November 07, 2011 Target Design Completion: October / 2012 Projected Bid Opening: TBD Projected Construction Start Date: TBD Design Status: The project is on the Preliminary Design phase and the due date is August 24, 2012. Pending Issues: Street ROW acquisition at Edgemere & RC Poe, required to improve the Roundabout design. Design Cost: $ 170,389.25 Current Construction Cost Estimate: TBD Total: TBD Project Contacts Project Manager Design Consultant Construction Contractor Lupe Salinas 541-4200 Huitt-Zollars, Inc. TBD Page 1 of 1

More Related