EMBARQ – FLORIDA, INC.

EMBARQ – FLORIDA, INC. 2007 STORM PREPAREDNESS. Sandra Khazraee – Regulatory Manager. May 23, 2007. NETWORK HARDENING – Ongoing. Implemented Pole Inspections Instituted Engineering Design Changes

jenn
Download Presentation

EMBARQ – FLORIDA, INC.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EMBARQ – FLORIDA, INC. 2007 STORM PREPAREDNESS Sandra Khazraee – Regulatory Manager May 23, 2007

  2. NETWORK HARDENING – Ongoing • Implemented Pole Inspections • Instituted Engineering Design Changes • Replaced damaged Outside Plant with facilities less susceptible to future storm damage • Replaced batteries in DLCs

  3. DISASTER PREPAREDNESS PLAN and ACTION • Implement existing disaster preparedness plans in advance of forecasted storm • Coordinate with other utilities and with governments through presence at EOCs • Communicate regularly and frequently both internally and externally

  4. POST STORM RECOVERY • Follow Disaster Preparedness Plan for post storm recovery • Activate Rapid Response Team • Area Survey Teams canvass the area as soon as it is safe to do so • Immediately begin restoration with prioritized circuits restored first