Initial concepts for delivering additional water. LWDD. C-14/C-13/ C-11 Basins. Restudy D-13R4 (aka 245K). D-13R4 Method. Backpump C-51 through LWDD canals Backpump into Ag Reserve Reservoir Send Releases from Ag Reservoir through LWDD E-1W Canal to Hillsboro Impoundment

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Initial concepts for delivering additional water' - jeff


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide2

LWDD

C-14/C-13/ C-11 Basins

Restudy D-13R4 (aka 245K)

slide4

D-13R4 Method

  • Backpump C-51 through LWDD canals
  • Backpump into Ag Reserve Reservoir
  • Send Releases from Ag Reservoir through LWDD E-1W Canal to Hillsboro Impoundment
  • Hillsboro Impoundment stores water in 300 acres at 12 feet deep, also backpumps more of Hillsboro Canal
  • Release water from Impoundment and treat in 2,160 acre STA
  • STA treated water discharged into WCA-2A
  • Assumed flood protection in all affected areas will be maintained.

Ag Reserve

Reservoir

Hillsboro Impoundment

STA

slide5

C-14

C-13

C-42

North New

River Canal

US-27 Conveyance Canal

D-13R4 Method

  • Backpump C-14 and C-13 canals
  • Route water south and west via C-42 and North New River Canals to US-27 conveyance canal
  • Route water south via US-27 conveyance canal to NLBSA, Bird Drive Recharge Area or Biscayne Bay
  • Additional water quality treatment may be required
  • Assumed flood protection in all affected areas will be maintained.
slide7

LWDD

C-14/C-13/ C-11 Basins

“Northwest Passage” (LWDD Runoff)

slide8

S-155A

STA-1W

STA-1E

Northwest Method

  • Backpump C-51 at S-155A
  • Route water west to STA’s for treatment and/or storage in EAA Reservoir