Security, Privacy & Infrastructure TC High Level Work Plan
This presentation is the property of its rightful owner.
Sponsored Links
1 / 3

Full TC Activities PowerPoint PPT Presentation


  • 87 Views
  • Uploaded on
  • Presentation posted in: General

Security, Privacy & Infrastructure TC High Level Work Plan. Face to Face: 5/12-5/14. Candidate Standards. IRB R&D. 90 minute calls: 1:00pm – 2:30pm EDT. 5/29. 6/4. 4/10. 4/17. 4/24. 5/1. 5/8. 5/15. 5/22. RDSS Section 2: Requirements. RDSS S3: Design.

Download Presentation

Full TC Activities

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Full tc activities

Security, Privacy & Infrastructure TC High Level Work Plan

Face to Face:5/12-5/14

CandidateStandards

IRB R&D

90 minute calls: 1:00pm – 2:30pm EDT

5/29

6/4

4/10

4/17

4/24

5/1

5/8

5/15

5/22

RDSS Section 2: Requirements

RDSS S3: Design

RDSS Sections 1-4: Candidate Standards

New Construct Development

Report on inherited constructs

Troubleshoot Requirements & Design issues

Consumer Use Cases

Provider Use Cases

Population Use Cases

Meeting cancelled

See Agenda

F2F Report out

Full TC Activities

Form Construct Teams as needed

Report

TP20awaiting standards development…

Report

TP30 awaiting standards development…

Report

TN900

Report

T17

Individual/ Team Work Items

Education & Outreach (as needed)

NHIN Responses (as needed)

Report

Med Mgt (Dig Sig & T17,C44 etc)

Lab Message (TP14)


Use case meetings

Use Case Meetings

  • Pre-work:

    • Send previous work items to PTCs leadership as read-ahead

    • Invite PTCs/liaisons to participate in SPI-TC scheduled meetings

  • Agenda for each Use Case Call:

    • Use Case 1:

      • Scope/Design from Perspective TC (10 mins)

      • Review analysis on the use case with PTC (20 mins)

      • Reach Consensus on construct design (reuse/repurpose/new) (10 mins)

    • Use Case 2:

      • Scope/Design from Perspective TC (10 mins)

      • Review analysis on the use case with PTC (20 mins)

      • Reach Consensus on construct design (reuse/repurpose/new) (10 mins)


Draft face 2 face agenda

Draft Face 2 Face Agenda

  • Requirements & Design with PTCs

  • Reports from Teams:

    • TP20

    • TP30

    • T17

    • TN900

  • TC review and adoption of ICM-WG recommendations


  • Login