Security, Privacy & Infrastructure TC High Level Work Plan
Download
1 / 3

Full TC Activities - PowerPoint PPT Presentation


  • 107 Views
  • Uploaded on

Security, Privacy & Infrastructure TC High Level Work Plan. Face to Face: 5/12-5/14. Candidate Standards. IRB R&D. 90 minute calls: 1:00pm – 2:30pm EDT. 5/29. 6/4. 4/10. 4/17. 4/24. 5/1. 5/8. 5/15. 5/22. RDSS Section 2: Requirements. RDSS S3: Design.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Full TC Activities' - jeanne


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Security, Privacy & Infrastructure TC High Level Work Plan

Face to Face:5/12-5/14

CandidateStandards

IRB R&D

90 minute calls: 1:00pm – 2:30pm EDT

5/29

6/4

4/10

4/17

4/24

5/1

5/8

5/15

5/22

RDSS Section 2: Requirements

RDSS S3: Design

RDSS Sections 1-4: Candidate Standards

New Construct Development

Report on inherited constructs

Troubleshoot Requirements & Design issues

Consumer Use Cases

Provider Use Cases

Population Use Cases

Meeting cancelled

See Agenda

F2F Report out

Full TC Activities

Form Construct Teams as needed

Report

TP20 awaiting standards development…

Report

TP30 awaiting standards development…

Report

TN900

Report

T17

Individual/ Team Work Items

Education & Outreach (as needed)

NHIN Responses (as needed)

Report

Med Mgt (Dig Sig & T17,C44 etc)

Lab Message (TP14)


Use case meetings
Use Case Meetings

  • Pre-work:

    • Send previous work items to PTCs leadership as read-ahead

    • Invite PTCs/liaisons to participate in SPI-TC scheduled meetings

  • Agenda for each Use Case Call:

    • Use Case 1:

      • Scope/Design from Perspective TC (10 mins)

      • Review analysis on the use case with PTC (20 mins)

      • Reach Consensus on construct design (reuse/repurpose/new) (10 mins)

    • Use Case 2:

      • Scope/Design from Perspective TC (10 mins)

      • Review analysis on the use case with PTC (20 mins)

      • Reach Consensus on construct design (reuse/repurpose/new) (10 mins)


Draft face 2 face agenda
Draft Face 2 Face Agenda

  • Requirements & Design with PTCs

  • Reports from Teams:

    • TP20

    • TP30

    • T17

    • TN900

  • TC review and adoption of ICM-WG recommendations


ad