Advertisement
1 / 9

Contribution of PT. PLN. Geothermal in Supporting Energy Development in Indonesia PowerPoint PPT Presentation


  • 89 Views
  • Uploaded on 22-08-2012
  • Presentation posted in: General

Contribution of PT. PLN. Geothermal in Supporting Energy Development in Indonesia. b y PT. PLN Geothermal f or Energy Business Forum of the 38 th Meeting of the APEC Working Group (Bali, November 17, 2009). About PT. PLN Geothermal (PLN-G). - PowerPoint PPT Presentation

Download Presentation

Contribution of PT. PLN. Geothermal in Supporting Energy Development in Indonesia

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Contribution of pt pln geothermal in supporting energy development in indonesia

Contribution of PT. PLN. Geothermal in Supporting Energy Development in Indonesia

by

PT. PLN Geothermal

for

Energy Business Forum of the 38th Meeting of the APEC Working Group

(Bali, November 17, 2009)


About pt pln geothermal pln g

About PT. PLN Geothermal (PLN-G)

  • PLN-G is a subsidiary company of PT. PLN (Persero), a state-owned power company in Indonesia.

  • PLN-G was legally established on April 6, 2008 for aiming at supporting the power development business in Indonesia through the program of geothermal energy development .


The geothermal power business in indonesia

The Geothermal Power Business in Indonesia

  • Indonesia presents a unique geothermal power value chain

  • Incumbents operate at various points in this value chain

  • Terminology:

    • Brownfield: A field that has had its geothermal resources tested sufficiently for development to proceed

    • Greenfield: Any field that has not yet been tested.

    • Legacy WKP: WKP belonging to PGE and PLN governed by Keppres 45/1991. Includes elements 4 through 9 of value chain.

    • New WKP: WKP offered under Law 27/2003. Includes elements 1 through 9 of value chain

Geothermal Power Value Chain

1.

Opportunity Identifica- tion

2.

Preliminary

Resource

Assessment

3.

WKP

Proposal Preparation

4.

Exploration

5.

Feasibility

Study& PPA Negotiation

7.

Power Plant Construction

8.

Power Station O&M

9.

Field O&M

6.

Field Develop- ment

Greenfield

Brownfield

PLN-G (near-term)

PLN-G (long-term)


Opportunities for pln g

Opportunities for PLN-G

Near term (Captive)

Long term (Competitive)

  • PGE Legacy WKP, to be developed & operated by PGE & GDE

  • ( Power plant development, construction and O&M opportunity)

    • Ulubelu 3&4 (2x55)

    • LumutBalai 1-4 (4x55)

    • Lahendong 5&6 (2x20)

    • Karaha (1x30)

    • Dieng 1-3 (3x60)

    • Patuha 1-3 (3x60)

Existing PLN/IP, owned & operated power stations

(Power plant O&M opportunity)

  • Salak 1-3 (3x61)

  • Kamojang 1-3 & 5 (1x30 & 3x55)

  • Lahendong 1-3 (3x20)

  • Darajat 1 (1x55)

PGE Legacy WKP, to be developed, owned & operated by PLN

(Power plant development and O&M opportunity)

  • Ulubelu 1&2 (2x55)

  • Lahendong 4 (1x20)

  • Kotamobagu 1-4 (4x20)

  • Sungai Penuh 1&2 (2x55)

  • HuluLais 1&2 (2x55)

493 MW total (1)

760 MW total (1,5,6)

430 MW total (1,5)

  • PLN/GOI Legacy WKP, to be developed by PLN

  • (Integrated upstream/downstream development and O&M opportunity)

    • Tulehu (2+16)

    • Ulumbu (4x2.5)

    • Mataloko (1x2.5)

    • Sembalun (1x10)

  • New WKP Development (Competitive basis)

  • (Opportunities throughout value chain)

~1,800 MW total (1,5,6,8)

40.5 MW total (1,5,6,8)


Fit schedule business line staging

Fit & Schedule: Business Line Staging

Existing PLN & IP

Power Station O&M

493 MW

PLN WKP

Power Station Construction Management

PLN WKP

Field Services

40.5 MW

PLN WKP

Power Station Development

PLN WKP

O&M Services

Projects under PLN/PGE MOU

Power Station O&M

Projects under PLN/PGE MOU

Power Station Development

430 MW

Projects under PLN/PGE MOU

Power Station Construction Management

PGE Power Stations

O&M Services won competitively

760 MW

New WKP Projects won

competitively*

Up to 1,800 MW

* If regulatory environment improves

2009

2010

2011

2014

2015

2016

2012

2013


Opportunities for partnership near term

Opportunities for Partnership (Near-term)

Existing PLN/IP, owned & operated

power stations

(Power plant O&M opportunity)

  • Salak 1-3 (3x61)

  • Kamojang 1-3 & 5 (1x30 & 3x55)

  • Lahendong 1-3 (3x20)

  • Darajat 1 (1x55)

O & M Partnership for Downstream:

- Expertise

- Technology

(PLN-G will be operating and maintaining all PLN’s GeoPPs according to our shareholder’s decision)

PGE Legacy WKP, to be developed,

owned & operated by PLN

(Power plant development and O&M opportunity)

  • Ulubelu 1&2 (2x55)

  • Lahendong 4 (1x20)

  • Kotamobagu 1-4 (4x20)

  • Sungai Penuh 1&2 (2x55)

  • HuluLais 1&2 (2x55)

  • O & M Partnership for Downstream:

  • - Expertise

  • - Technology

  • (G to G Loan will be financing for downstream dev.)

  • For Tulehu & Ulumbu

  • O & M Partnership for Downstream:

  • - Expertise

  • - Technology

  • (G to G Loan is proposed to finance for total project)

  • For Mataloko & Sembalun

  • Partnership for Preliminary Survey, Tender, Upstream & Downstream Development, O & M for Upstream & Downstream

  • (Government/Local Government will be tendering both)

  • PLN/GOI Legacy WKP,

  • to be developed by PLN

  • (Integrated upstream/downstream development and O&M opportunity)

    • PLN ‘s WKP:

    • Tulehu (2+16) & Ulumbu (4x2.5)

    • GOI’s WKP:

    • Mataloko (1x2.5) or Sembalun (1x10)


Opportunities for partnership long term

Opportunities for Partnership (Long-term)

  • PGE Legacy WKP, to be developed &

  • operated by PGE & GDE

  • ( Power plant development, construction and O&M opportunity)

    • Ulubelu 3&4 (2x55)

    • LumutBalai 1-4 (4x55)

    • Lahendong 5&6 (2x20)

    • Karaha (1x30)

    • Dieng 1-3 (3x60)

    • Patuha 1-3 (3x60)

  • Tender and O & M Partnership for Downstream:

  • Expertise

  • Technology

  • Equity

  • New WKP Development (Competitive basis)

  • (Opportunities throughout value chain)

  • If regulatory environment improves, PLN -G will be participating in the tender


Key notes

Key Notes

  • In the near term, PLN-G can maximize the value for PLN by leading existing & planned geothermal power plant operations.

    WHY?

  • Centralizing PLN’s geothermal operations would create economies of scale, management focus & capacity.

    Lesson-Learnt

  • Experience with small PLN WKP (Concession) can enhance understanding of industry with limited risk.


Thank you

Thank you