Massachusetts Pressure Washwater Treatment Demonstrations. Robin Lacey – MA CZM. The Problem. Cape Ann Marina - Gloucester. Chemical pre-treatment for discharge to local sewer (American Cleanway) Certified operator required – Grade 2 Must remove large solids before treatment

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Massachusetts Pressure Washwater Treatment Demonstrations' - jarrod-eaton


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript


Cape ann marina gloucester
Cape Ann Marina - Gloucester

  • Chemical pre-treatment for discharge to local sewer (American Cleanway)

  • Certified operator required – Grade 2

  • Must remove large solids before treatment

  • Dried sludge = solid waste

  • Stormwater Issues

  • Costs

    System - $25K (system, start-up chemicals, and training)

    Total - $48K (includes washpad, site work, electrical, plumbing…)




Treatment system
TreatmentSystem


Arey s pond boatyard chatham
Arey’s Pond Boatyard - Chatham

  • Closed-loop re-circulating system (RGF Environmental)

  • Settling, physical filtration, odor control

  • No operational permits

  • No certified operator

  • Owner satisfied with system after 2 seasons

  • Costs

    System - $16.3K (system and training)

    Total - $36.7K (includes washpad, electrical, plumbing…)



Treatment system1
Treatment System

Control Panel



The End

Robin Lacey

Massachusetts Office of Coastal Zone Management

251 Causeway Street, Suite 800

Boston, MA 01890

617-626-1220

[email protected]