Aero design
This presentation is the property of its rightful owner.
Sponsored Links
1 / 10

AERO Design PowerPoint PPT Presentation


  • 67 Views
  • Uploaded on
  • Presentation posted in: General

AERO Design. Brian Martinez Chase Beatty Mohammed Ramadan Noe Caro. SAE AERO group 2012 competition Van Nuys, California March 16-18 Chase Beatty: Team Leader Brian Martinez: Organizer Mohammed Ramadan: Financial Officer Noe Caro: Historian. Description/Responsibilities.

Download Presentation

AERO Design

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Aero design

AERO Design

Brian Martinez

Chase Beatty

Mohammed Ramadan

Noe Caro


Description responsibilities

  • SAE AERO group 2012 competition

  • Van Nuys, California

  • March 16-18

  • Chase Beatty: Team Leader

  • Brian Martinez: Organizer

  • Mohammed Ramadan: Financial Officer

  • Noe Caro: Historian

Description/Responsibilities


Customer description

  • Dr. John Tester

    • SAE advisor since 2000

  • Judges at AERO competition

Customer Description


Project description

  • Design and build an airplane

  • Combined dimensions cannot exceed 225”

  • Take off within 200ft

  • Land and stop within 400ft

  • Payload and airplane cannot exceed 55lbs

  • Fly in a circle at least once

  • No lighter than air aircrafts or helicopters

Project Description

Land within 400’

Takeoff within 200’


Project description cont

  • Propeller cannot be made out of metal

  • Fiber-Reinforced Plastic is prohibited

  • No fuel pump

  • Cannot used gear boxes—gear ratio

  • Fuel supplied by competition

  • No gyroscope

  • Must raise our own funds

Project Description cont.


Preliminary project schedule

Preliminary Project Schedule


Materials

  • Balsa Wood

  • Fuel Tank

  • Bass Wood

  • Engine

  • Heat Shrink Plastic Film

  • Wood Glue

  • Reicever

Materials


Preliminary research

  • Wings

    • Eppler airfoil

    • Rectangular Planform

  • Tail

    • Conventional tail

  • Fuselage

    • Round

    • Square

Preliminary Research


Preliminary research cont

  • Landing Gears

    • Tricycle

    • Tail dragger

    • Retractable

  • Engine System

    • Propulsion

    • O.S 61FX w/E-4010 muffler

Preliminary Research cont.


Conclusion

  • Solidworks model

  • Software for airfoil analysis

  • Regular meetings to keep group on track

  • Goal: Build aircraft in time for competition and practice real life engineering

Conclusion


  • Login