Management Plan. : is designed to add a new generation wide field bolometer camera to the JCMT. GOAL: To maximize the science yield in the context of future facilities. What is the minimum time to results?. Estimate 6 years

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Management Plan' - janna-schroeder


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Management plan
Management Plan

: is designed to add a new generation wide field bolometer

camera to the JCMT

GOAL:To maximize the science yield in the context of future facilities

What is the minimum time to results?

Estimate 6 years

as the minimum possible time to results with realistic risk management


Contributing organisations
Contributing organisations

  • Key organizations:

  • ATC Key skills and experience in major projects including SCUBA

  • NIST The clear leader in TES technology, SQUID Muxes and control electronics

  • U of E Demonstrated expertise in Si micro-machining + technology development in the UK

  • QMW Key technologies and expertise, in filters, FTS testing, window materials, detector testing

  • JAC The customer plus key experience with SCUBA


Key staff positions
Key Staff Positions

  • Key positions:

  • Project Manager Internationally distributed project - good project management skills plus technical contribution

  • Project Scientist Active mm/submm observer and scientist with “customer view point” and good laboratory skills


Key staff positions1
Key Staff Positions

  • Key positions:

  • Systems Engineer Experienced project/systems engineer to manage all the technical complexity of the project from capturing requirements to delivering the verified instrument

  • Instrument Scientist Good laboratory scientist, ideally with clean room experience



Scuba 2 array development
SCUBA 2 Array Development

  • development supported by PPARC grant (assumed)

  • and SCUBA 2project

  • funds


Project plan for technology development
Project Plan for Technology Development

  • NB Science

  • Instrument

  • not planned

  • in yet


Detector development ~ 50% of total

Software effort ~ 30% of total

Technology Development Cost and Effort


Outline of project resources estimated on limited work
OUTLINE OF PROJECT RESOURCES (Estimated on limited work)