BRIDGE PHOTOS

BRIDGE PHOTOS. Locations 1, 2, and 3. City of Irving Proposal #090M-10F. COLOR KEY: C1 – Base Color. C2 – Accent Color. Project Notes (Applies to all locations).

jaden
Download Presentation

BRIDGE PHOTOS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BRIDGE PHOTOS Locations 1, 2, and 3 City of Irving Proposal #090M-10F COLOR KEY: C1 – Base Color C2 – Accent Color

  2. Project Notes(Applies to all locations) • Unless otherwise noted, color designations called out for individual bridge and approach components apply to all exposed surfaces of the same. • Unless otherwise noted, color designations called out for individual bridge and approach components apply to all like and similar components found elsewhere on structure. • All piping/conduit fastened to or hanging from bridge components to be painted same color as surface immediately behind it. • Remove all mounted signage and replace after painting has been completed. • Prior to placement of order for finish paint materials, Contractor to apply designated paint colors to sample bridge and approach components at each work location for City review and approval. Any change in color designation requested at that time will be at no additional cost to the City.

  3. LOCATION 1:TRE Railroad Bridge (Looking North Along O’Connor Rd from Rock Island) Outboard Girders: C2 (Outside Face, Top, Bottom and Ends) Walkways, Railings, Supports, Deck Underside: C2 Other Misc. Bridge Components Exposed to View from Street Level: C2 All Bridge Retaining and Wing Walls: C1 (All Exposed Surfaces)

  4. LOCATION 1:TRE Railroad Bridge (Looking S.E. Along O’Connor Rd) Outboard Girders: C2 (Outside Face, Top, Bottom and Ends) Walkways, Railings, Supports, Deck Underside: C2 Other Misc. Bridge Components Exposed to View from Street Level: C2 Parking Lot Retaining Wall: C1 All Bridge Retaining and Wing Walls: C1 (All Exposed Surfaces) This Retaining Wall and Railing are Not Included in Bid

  5. LOCATION 2:TRE Railroad Bridge (Looking N.W. Along Sowers Rd from Rock Island Rd) Bridge Deck and Beams: C2 (Including Top and Underside Exposed Surfaces) Headwall and Support Columns: C2 Bent Caps, Columns & Misc Support Items: C1 Channel Protection: C2 Vertical Retaining Wall: C1 (All Exposed Surfaces)

  6. LOCATION 2:TRE Railroad Bridge (Looking North Along Sowers Rd from Rock Island Rd) Headwall and Column Supports: C2 Concrete/Steel Deck and Beams: C2 (Including Top and Underside Exposed Surfaces) Bent Caps, Columns and Misc. Steel Support Components: C1

  7. LOCATION 2:TRE Railroad Bridge (Looking South Along Sowers Rd Toward Rock Island Rd) Headwall and Support Columns: C2 Railing, Walkway and Misc. Support Components: C2 Bridge Deck and Beams: C2 (Including Top and Underside Exposed Surfaces) Columns, Bent Caps and Misc. Support Components: C1

  8. LOCATION 3:S.H. 183 @ Story Rd – East Approach Outboard Beam: C2 (Outside Face and Bottom Flange) Bridge Rail: C2, Parapet: C1 (All Exposed Surfaces) Abutment: C1/C2 (All Exposed Surfaces) Approach Guardrail: C1 (Outside Face and Top) Retaining Wall: C1 (All Exposed Surfaces) Riprap: C1 Deck Extension: C2 Columns and Bent Caps: C1

  9. LOCATION 3: S.H. 183 Bridge @ Story Rd – West Approach Outboard Beam: C2 (Outside Face and Bottom Flange) Bridge Rail: C2, Parapet: C1 (All Exposed Surfaces) Deck Extension: C2 Approach Guardrail: C1 (Outside Face & Top) Abutment: C1/C2 (All Exposed Surfaces) Columns and Bent Caps: C1 Special Note: Turn lane construction work currently underway at west approach. Include in cost of work similar surface area/treatment as noted at east approach. Construction work scheduled for completion by February 1, 2010.

  10. LOCATION 3: S.H. 183 @ Story Rd – Bridge Structure Special Note: Unless otherwise noted, underside of bridge (deck, beams and misc. items) to be power washed Only – No painting Abutment Cap: C1 Riprap: C1

  11. LOCATION 3: S.H. 183 Bridge @ Story Rd – Bridge Structure Special Note: Unless otherwise noted, underside of bridge (deck, beams and misc. items) to be power washed only – No painting Columns and Bent Caps: C1