Montana – Alberta Tie, Ltd. (MATL) Status Report

Montana – Alberta Tie, Ltd. (MATL) Status Report. By R. Peter Mackin P.E. Planning Coordination Committee Meeting #14 Salt Lake City, UT October 26-27, 2006. MATL Overview. Background Current Project Status Phase 2 Studies. MATL Background.

jada
Download Presentation

Montana – Alberta Tie, Ltd. (MATL) Status Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Montana – Alberta Tie, Ltd. (MATL)Status Report By R. Peter Mackin P.E. Planning Coordination Committee Meeting #14 Salt Lake City, UT October 26-27, 2006 2108 Marchita Way, Carmichael, CA 95608; Phone (916) 359-3986

  2. MATL Overview • Background • Current Project Status • Phase 2 Studies

  3. MATL Background • Northern termination near Lethbridge looping into the Lethbridge – Milo 240 kV line • Southern termination at Great Falls 230 kV • Line length approx. 190 miles • Cost – approx. $100 M • Proposed rating +/- 300 MW

  4. MATL Current Design • Phase Shifter • 330 MVA +/- 70 degree phase shift (external) • Shunt Compensation • 2 50 MVAr banks at MATL AB • 4 40 MVAr banks at Marias

  5. MATL Current Design • Line design finalized • 1590 kcmil Falcon on monopole and H-frame towers • Series Compensation • Northern segment: 60% • Southern segment: 50%

  6. MATL Current Status • Phase Shifter ordered from ABB • SNC Lavalin hired as EPC on August 29 • Tower and conductor suppliers TBD

  7. MATL Current Status • All regulatory filings have been made • AEUB • NEB • FERC • DOE • MDEQ • FERC has conditionally accepted MATL’s transmission rights • Capacity is fully subscribed

  8. MATL Phase 2 Studies • Resubmitted WECC notification for Project Rating Review due to changes in Project scope. 60 day period expires October 31.

  9. MATL Phase 2 Studies • Non-Simultaneous • Simultaneous • Path 1 (AB-BC) • Path 3 (BC-NW) • Path 8 (MT-NW) • Path 18 (MT-ID) • Sensitivities • Southern AB Wind • South of Great Falls generation • Wind generation connected to Marias

  10. Questions?