Welcome to Green Mountain Stadium Paul Georgieff Nicole Whitney Introduction and Purpose Vermont does not currently have a professional sports team because they do not have a stadium in which to play. By building a large stadium, we could facilitate football, baseball, and soccer teams.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'grp10' - jacob


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Slide1 l.jpg

Welcome to Green Mountain Stadium

Paul Georgieff

Nicole Whitney


Introduction and purpose l.jpg
Introduction and Purpose

  • Vermont does not currently have a professional sports team because they do not have a stadium in which to play.

  • By building a large stadium, we could facilitate football, baseball, and soccer teams.

  • The stadium could also be used by local colleges and high schools for championship games.


Scope l.jpg
Scope

  • Many of the surrounding states already have stadiums.

  • Our focus was on the entire state of Vermont.


Criteria l.jpg
Criteria

  • Population

  • Roads

  • Hazardous waste

  • Schools

  • Endangered Species

  • Structures

  • Wetlands


Population criteria l.jpg
Population Criteria

Highly populated location

Spectators are necessary

Chittenden County has highest population


Roads criteria l.jpg
Roads Criteria

  • Close proximity to major roads

  • Gets spectators to games

  • Gets teams to games

  • Between 50 and 500 meters to a major road


Hazardous waste criteria l.jpg
Hazardous Waste Criteria

  • Don’t want stadium on waste sites

  • It’s a public facility

  • Health concerns need to be taken into account

  • Minimum of 500 meters from waste site


Schools criteria l.jpg
Schools Criteria

  • Schools may use stadium

  • Close proximity to UVM, and many major local high schools

  • As close as possible to schools


Endangered species criteria l.jpg
Endangered Species Criteria

  • We care about endangered species

  • Need to protect their habitats

  • Minimum of 500 meters from habitats


Structures criteria l.jpg
Structures Criteria

  • Cannot build on existing buildings


Wetlands criteria l.jpg
Wetlands Criteria

  • Cannot build on soggy land

  • Minimum of 50 meters from wetland


Data analysis l.jpg
Data Analysis

  • Considered each criteria

  • Used find distance, geoprocessing, buffers, clip, and map calculator to distill data


Buffers l.jpg
Buffers

500 meter buffer around hazardous waste sites

50 meter buffer around all wetlands





Map calculator l.jpg
Map Calculator

  • The low values were ideal

  • Map calculator was used to find optimal location

  • Based on endangered species, roads, and selected schools



Best locations l.jpg
Best Locations

  • Buffers and structures were placed over the map calculation

  • This map was used to find optimal locations (circled in red)


Conclusion and recommendation l.jpg
Conclusion and Recommendation

  • We recommend these two locations for the future site of the Green Mountain Stadium.

  • They were chosen because they had low values without buffer overlap.