Horizontal and Vertical Schedule Integration (Solution – Task 1 – Arrange Tasks)

Horizontal and Vertical Schedule Integration (Solution – Task 1 – Arrange Tasks). Technical Review. JRPG-P Operational Assessment. JRPG-P Delivery. Rqmts. Design. Fabricate Interface Hardware. Software Coding. Software Unit Testing. SW Subsys Test. HW/SW Integ & Test.

Download Presentation

Horizontal and Vertical Schedule Integration (Solution – Task 1 – Arrange Tasks)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Horizontal and Vertical Schedule Integration(Solution – Task 1 – Arrange Tasks) Technical Review JRPG-P Operational Assessment JRPG-P Delivery Rqmts Design Fabricate Interface Hardware Software Coding Software Unit Testing SW Subsys Test HW/SW Integ & Test UUV / JRPG-P Integ & Test

  2. Horizontal and Vertical Schedule Integration(Worksheet – Task 2 – Apply Budget to each Mk 60 UUV Task, selecting appropriate EV technique(s)) Technical Review JRPG-P Operational Assessment JRPG-P Delivery Rqmts22 0/100 Technique Design 50/50 Technique Fabricate Interface Hardware Weighted Milestone (WMS) Technique (Milestones at 2.5 and 4.5 months) Software Coding Percent Complete Technique (Supervisor Estimate) Software Unit Testing Apportioned based on 50% of Task D in previous period SW Subsys Test 50/50 Technique HW/SW Integ & Test WMS/%Complete Technique UUV / JRPG-P Integ & Test WMS/% Complete

  3. Horizontal and Vertical Schedule Integration(Solution – Task 3 – Draw cumulative BCWS for Mk 60 UUV)