An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Clamp Prototype Install and Schedules RIKEN/RBRC Itaru Nakagawa

  2. APR Deadline : Feb. 8 • Muon Arm Upgrade for W boson Detection (含むAbsorber effect、S/N) - ラルフ • Muon Trigger Performance (efficiency w/ cosmic等Run10データ解析)- 深尾- MuTr Cross Talk and Recapacitation effect - 今津- Recap clamp R&D - ケンタロー、中川

  3. Clamp Schedule Dry Air Cover Prototype-1 Delivery Install Delivery 50 more Clamps Install & Test Delivery 300 Clamps Install Supply Parts

  4. Road To Be Approved Clamp Install • Evaluate X-Talk Quench Effect (Jan) -> Tsutomu’s Code • Prove HV Performance (~July) • Budget • Production Schedule to be fit in by End of October • Scaffold Construction

  5. Cramp Production Schedule • 60個(2ヶ月) • 発注:4月末 -> 納品6月末 • 320個(2〜4ヶ月?) • 発注:6月〜8月->納品9月+10月末(分納) • インストール4〜8週間 6月のパフォーマンスを確認後プロダクションへ (遅くて7月第一週) Bottom Line • 部品調達2〜3週間を6月中に依頼すれば間に合うかも? • クランプ取り付けのユーティリティーは満足できるレベル。 • プリント基板はFixでよいか?基盤の製作を前倒しすればさらにspeed up。 • 変更の可能性がある部分は • プローブ(ピン/ゴム) • コーティング剤の材質や塗り方? • 電圧読み出しプローブ

  6. Octant-8 Clamp Install Octant 8 3810 3810 3810 3811 3811 3811 3812 3812 3813 3813 1-pin type 4-pin type

  7. Installed Clamps (Octant-8)

  8. Octant-7 Clamp Install Octant 7 3710 3710 3710 3711 Dead in Run9 Wire 192-223 But fixed in Run10 3711 3711 Conductive Rubber type 3712 3712 3713 3713

  9. Installed Clamps (Octant-7)

  10. Clamp Prototype Install Summary • 3 types of clamps (3 each are installed to North Station-3, Octant-7 and 8, Gap-0. • Nearly 100% electrical contacts were achieved by the clamps without removing coating. -> Clamp works well! • Will test with HV up to 1.5k with Ar/Co2 gas this week before closing the hatch. • Observing relieved cross talk effect may be difficult because of partial coverage (only 30% of all anode wires in Oct-8, 15% in Oct-7).

  11. Improving HV performance • Better Coating • Dry air cover to Station-3 • need to evaluate cost-effectiveness • Can be kept as back up if the prototype clamps behave poorly against HV

  12. coating • Turned out present anodes are mostly exposed to air. The existing coating is not isolating HV circuit from air well. • Redo coating with higher viscosity type

  13. Dry Air Cover Support

  14. Dry Air Cover • Mechanical Design by REPIC • First 2~3 Prototypes Delivery by Dec.28? • Install in Maintenance Day Dry Air Line Available @Oct8

  15. Please Sign Up! Expert Shift MuTrig-FEE your_ccount@rcf2:/phenix/WWW/run/11/contacts/mutrg_experts.html Edit by Yourself

  16. Please sign up! Expert Shift MuTr

  17. Muon Trigger Event Display Developed by Tsutomu Should Add RPC?

  18. Task List • Run Plan • Special Data Taking • Low B-field (Yoshi) • Zero suppression off run (different luminosity?) How many statistics needed? • MuTr HV Scan (Cosmic/Beam?) • Dump Important parameters into Database (Yoshi+Katsuro) • Threshold, Latency, BCLK window, Logic, (Delta_s?, LUT?) • Optimization of Parameters (Yoshi+Katsuro+Itaru) • Threshold .vs multiplicity • Logic • BCLK Window • Low Level Online Monitor (Katsuro) • Stability monitor (Seoul) • Low Level • Physics (J/psi) mass width, position, S/N, etc… • Semi-Online Track Monitoring (Yoshi?) • Rejection power .vs rate • Efficiency .vs rate • Efficiency map