1 / 17

Edit this text for your title

Edit this text for your title. Planer for MEK 4450 Marine operasjoner. Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA, June 2011. Lift phases. Load out Transportation Over boarding Removal of sea fastening Lift up Lifting route Start lowering

ivana-avila
Download Presentation

Edit this text for your title

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Edit this text for your title Planer for MEK 4450 Marine operasjoner Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA, June 2011

  2. Lift phases Load out Transportation Over boarding Removal of sea fastening Lift up Lifting route Start lowering Splash-zone Slamming Wave impacts Lowering Softer system,- resonance Landing Positioning

  3. Deck layout

  4. Deck layout Deck area Deck strength Lifting route

  5. Sea fastening Limiting weather criteria (transit, WoW) Low complexity Easy, swift and cost effective installation Swift removal. Minimized need for hotwork during removal

  6. Lifting from deck of vessel

  7. Lifting from deck of vessel

  8. Lifting from deck of vessel

  9. Lifting from deck of vessel Well defined route of lift. Static capacity of crane (DAF=1.3?) Clearance to ships side Restraining load from unwanted motions Test lift for all complex routings! Vessel ballasting. Vessel roll reduction not to be used. Slewing before luffing. Sufficent analysis performed?

  10. Splash zone

  11. Splash zone Often dimensioning for crane force Vessel listed towards lifted object Bouyancy reduces mass of object Ballasting of vessel Crane wire tension Sufficient time for air to evacuate No use of AHC Stability of lifted object Internal tanks Air filled compartment

  12. Further lowering Is the total duration understood? Fatigue issues on the load Effects on the crane and wire Load rotation control Increased weight of the wire. Generally no use of AHC Deep water resonance Deep water effects

  13. Gjennomgang lekse

  14. Landing Position control vs tolerances Position, Heading and Inclination Landing speed Damage module Soil damage (stiff clay) Reduction of tension in crane wire Vessel movement and ballasting Capacity of AHC Disconnection of rigging

  15. Recovery

  16. Recovery Rigging connection points Suction effects from seabed Water escapation Crane capacity Load control and means of load motion restraints Sufficient deck space Disconnect rigging Seafastening