1 / 1

Future-Based Scheduling

Wireless Schedulers with Future Sight via Real-Time 3D Environment Mapping Matthew Webb, Congzheng Han, Angela Doufexi and Mark Beach.

israel
Download Presentation

Future-Based Scheduling

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wireless Schedulers with Future Sight viaReal-Time 3D Environment MappingMatthew Webb, Congzheng Han, Angela Doufexi and Mark Beach Aim : Develop a flexible new scheduling methodology which improves fairness by adding knowledge of users’ future data rates into the proportional fair scheduling metric. • Introduction • New applications, such as ‘Layar’ and ViewNet allow augmented reality models to represent the physical environment in real-time. • ViewNet can produce and store an ‘occupancy grid’ associating position to rate, channel state, etc. and a low-resolution 3D map to permit, e.g., coarse RSSI prediction by identifying walls, doors and windows. • Future data-rates can be estimated by extrapolating a user’s recent motion track and relying on previously stored values of data-rate at those co-ordinates, or low-resolution ray-tracing of stored physical structure. Window marker Door marker Occupancy grid Wall • Future-Based Scheduling • In a K-user system, extend user k’s proportional fair (PF) metric to include measures of their future data-rates: • Scalars , , ,  allow choice of balance between past, present and future. • Can choose how to define Fk(t) and use in numerator and/or denominator: • Exponentially-weighted decay over Ntime-slots into future, similarly to Tk(t) into past. In numerator: denote as ‘1N’ In denominator: denote as ‘1D’ • Compute Tk(t) over both past and future windows, as if user always transmits, for N time-slots. • Fully compute scheduling at N future times, and use resulting Tk(t) in PF metric. Effectively,  =  = 0. Performance • Future schedulers based on ‘1N’ give fairness improvement over PF for small capacity loss. • Future knowledge in numerator (‘1N’) acts to smooth out short dips in rate by compensating in the metric with near-term increases in rate. • Best configuration has future information weighted less than past (,  < ,  ), but does include both. • Full re-scheduling (‘3’) gives longer-term average for Tk(t), but statistics of BRAN channel are stationary. More useful if path-loss is changing. • ‘1N + 3’ makes decisions on the ‘1N’ metric, but long-term average rate is on PF basis, so can assume ‘wrong’ users, and capacity falls slightly. tc = tf = N =300, 6 users • With various system-level parameters, fairness enhancement for ‘1N’ and ‘1N+2’ is retained. • General behaviour is familiar from classical PF scheduler: • More users reduces fairness – but future-based schedulers do much better than greedy. • Longer tc and tf trade fairness for capacity. But ‘1N + 3’ loses on both – since decisions it makes are based on more wrong information. • Increasing future horizon, N, also improves fairness as scheduling metric can take more future information into account if there is a near-term dip in rate for a particular user.  =  = 5;  =  = 1 • Conclusions and Future Work • Future-based schedulers can achieve better fairness and nearly the same capacity as classical PF scheduler. • The new scheduling metric including future knowledge allows a flexible capacity-fairness tradeoff to be made. • Future-based schedulers with a significant weighting to the past (, ) are the most successful in this channel model. • Future work: Analyse effects of (i) imperfect future data-rates; (ii) motion, i.e. changing path-loss in channel models. This work was co-funded by the UK Technology Strategy Board. We thank all the partners to the ViewNet project for their help and discussions.

More Related