ATLAS gas systems meeting. Outline Introduction Review usage of ATLAS gas M&O 2013 Review achievements during 2013 Agree/Review activities and schedule for 2014 . Outline. PH-DT-DI Gas Service Team. Gas Service Team mandate:

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' ATLAS gas systems meeting' - isra


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
atlas gas systems meeting
ATLAS gas systems meeting

Outline

Introduction

Review usage of ATLAS gas M&O 2013

Review achievements during 2013

Agree/Review activities and schedule for 2014

Outline

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

ph dt di gas service team
PH-DT-DI Gas Service Team
  • Gas Service Team mandate:
  • M&O and upgrades of the gas systems for all the LHC experiments:
  • preventive and corrective maintenance on 30 gas systems
  • on-call service all along the year (24/24 7/7) – phone 162516
  • Construction of gas systems for other experiments at CERN (CLOUD, NA62, LINAC4, …)
  • General support for test beam and equipment belonging to external users.

ALICE

Albin Wasem

Introduction – Working team

FSU team

Jonathan Dumollard

AbdelmajidLaassiri

Benjamin P. Marichy

HerveMartinati

Ace Ordanov (User)

Cedric Landraud (also CMS-CO2)

Guillaume Lacroix (also CERN Expo)

ATLAS

Frederic Merlet (0.25)

Louis-P. De Menezes (0.5)

Coordination

R. Guida

CMS-TOTEM

Andrea D’Auria (0.5)

LHCb

Patrick Carrie (0.5)

Steven Pavis (0.25)

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

ph dt di gas service team1
PH-DT-DI Gas Service Team

First contact persons for all issues related to ATLAS gas systems during working hours is

in charge of:

-standard operation

-standard maintenance/small modifications

-daily check of all systems

ATLAS

Louis-P. De Menezes – Frederic Merlet

16-2518 – 16-4089

ATLAS experiment and Gas Service Team

If Louis-P. and Frederic are on holiday or busy:

-during working hours  call directly Roberto (16-2146)

-outside working hours  call directly on-call service (16-2516)

Outside working hours call directly on-call service (16-2516)

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

gas service working team
Gas Service working team
  • In order to cope with LS1 a significant reinforcement of the team during 2013 was needed:
    • two new users with high experience in the workshop (mechanics and gas systems)
    • many students for short and well defined projects
  • Details:
  • CERN FTE (and students > 1 year):
    • 6.3 FTE: +1.3 wrt 2012
      • Ernesto: TTS 50% for gas project
  • “FSU” (FSU + technical users):
    • 5.5 FTE: +1.5 wrt 2012
      • Ace: user on ATLAS budget
      • Andrei: user on ALICE budget
  • Trainees (student < 1 year)
    • 1.9 FTE: +1.8 wrt 2012
      • 4 trainees (3 from Poland, 1 from Canada)
      • 2 summer students
      • 2 children of staff members

Working team

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

ph dt di gas service team2
PH-DT-DI Gas Service Team
  • 2013 activities can be divided into three main sectors:
    • Standard maintenance of gas systems for the LHC experiments
    • LS1 consolidation program for the LHC experiments
    • Not LHC experiments/support to users
  • Standard maintenance andLS1 consolidation programconstitute the main field of activity
  • Not LHC experiments and support to users represent about 20% of the activities

LS1 – 2013: Overview

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

review usage of atlas gas m o 2013
Review usage of ATLAS gas M&O 2013
  • ATLAS contribution to M&O budget for gas systems:
  • 189 + 45 (LS1 consolidation) + 13 (MDT Pneumatic valves) kCHF
  • Total 247 kCHF

On-call service:

ATLAS gas M&O 2013: on-call

  • Detector distribution (MDT PT&PCV, RPC, TFC)
  • ID CO2 flow
  • Purifiers (TRT, RPC)
  • Filling - restart systems (RPC, TGC)
  • Power cuts - restart all systems
  • Gas supply (CO2, Ar/H2)
  • Analysis systems (specific selection)
  • Exhaust module (TRT)
  • Software (recipe parameters)
  • Pump (membrane RPC)
  • PLC failure (MDT)
  • Profibus failure (CSC)

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

review usage of atlas gas m o 20131
Review usage of ATLAS gas M&O 2013

On-call service summary

On average only 1.5 h/year/system of downtime

(power-cuts and outside events excluded)

Intervention triggered by:

ATLAS gas M&O 2013: on-call

  • Intervention are:
  • Equally distributed between experiments
  • Decreasing with time 

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

review usage of atlas gas m o 20132
Review usage of ATLAS gas M&O 2013

ATLAS gas M&O 2013: material

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

review usage of atlas gas m o 20133
Review usage of ATLAS gas M&O 2013

ATLAS gas M&O 2013: material

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

review usage of atlas gas m o 20134
Review usage of ATLAS gas M&O 2013

ATLAS gas M&O 2013: material

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

review usage of atlas gas m o 20135
Review usage of ATLAS gas M&O 2013

ATLAS gas M&O 2013: material for gas workshop

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

review usage of atlas gas m o 20136
Review usage of ATLAS gas M&O 2013

FSU and users (i.e. Ace)

ATLAS gas M&O 2013: FSU resources

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

review usage of atlas gas m o 20137
Review usage of ATLAS gas M&O 2013

Summary:

ATLAS gas M&O 2013: summary

about 26 kCHF overspending

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

2013 schedule
2013 schedule

LS1 – 2013 schedule

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

2014 schedule
2014 schedule

More details available on the excel table in agenda

LS1 – 2014 schedule

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

software upgrade
Software upgrade

Main responsible:

Steven Pavis

  • EN-ICE ispreparing the migration to a new software version (CPC6 & more).
  • The migration requires to (~) completely rewrite the code (PLC+PVSS):
  • Preparation phase needed to definestrategy and milestons
    • Define modules, test logic, …
    • Validation of one/twogassystemscoveringalmost all functionalities
    • Deployment on one experiment (all detectors)
    • Deployment on all the experiments
  • A completecommissioningwillberequired (same as itwasdoneat the first start-up of the gassystems)
  • About one-twoweek of stop/instability for each detector (CSC, RPC, TRT, TFC, MDT, TGC, ID flushing, …)
  • ActivitiyscheduledfromJanuary to July 2014
  • MDT postponed due to PLC memory issues with CPC6
  • TGC postponed due to consolidation work

Software upgrade

R. Guida, L-P. De Menezes, F. Merlet PH-DT-DI Gas

software upgrade1
Software upgrade

Software upgrade

Main responsible:

Steven Pavis