Rail Runner Wireless System Project Certification Committee Presentation Close-out. December 19, 2012. To provide 100% wireless service allowing passengers to stay connected throughout their use of the NM Rail Runner train transportation system and stations.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Rail Runner Wireless System Project Certification Committee Presentation Close-out' - ishmael-olson


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Rail runner wireless system project certification committee presentation close out

Rail Runner Wireless System

Project Certification Committee Presentation

Close-out

December 19, 2012


Objective

To provide 100% wireless service allowing passengers to stay connected throughout their use of the NM Rail Runner train transportation system and stations.

Implement a wireless system that is flexible and scalable as the service area for the Rail Runner expansion. Future capabilities may eventually include such services as ticket vending, ticket verification, failover operations communication, emergency phones, video displays on both the trains and the platforms, and video surveillance equipment.

Objective:


Project manager
Project Manager: connected throughout their use of the NM Rail Runner train transportation system and stations.

Ted J GaudetteInformation Systems OfficerMid-Region Council of Governments809 Copper Ave. NWAlbuquerque, NM 87102Phone: (505)724-3609Cell: (505)453-2269Fax: (505)247-1753Email: [email protected]


Deliverables status
Deliverables Status: connected throughout their use of the NM Rail Runner train transportation system and stations.

  • Project Start Date – February 19, 2009

  • Deliverable # 1 Planning & Progress ReportingBonding - Complete

    • Project Work Plans

    • Design and System Engineering

    • System Test and Acceptance Plan

    • Status Reporting and Presentation

  • Deliverable # 2 Build Pilot System - Complete

    • Two Stations - Alvarado and Rio Bravo

    • Backhaul Sites

    • NOC (Network Operations Center - MRCOG)

    • One Train Set consisting of 1 Cab Car and 1 Coach Car


Deliverables status1

Deliverable # 3 Build South Phase (Belen to Bernalillo) connected throughout their use of the NM Rail Runner train transportation system and stations.- Complete

Implement Wireless System at 6 Stations

Installed Coaches and Cabs

Install 5 Backhaul Sites

Deliverable # 4 Build North Phase (Bernalillo to Santa Fe) - Complete

Implement Wireless System at 4 Stations

Install 12 Backhaul Sites

Deliverables Status:


Deliverables status2
Deliverables Status: connected throughout their use of the NM Rail Runner train transportation system and stations.

  • Deliverable # 5 System Test and Acceptance – Complete

    • Review of Fully Operational System

    • Knowledge Transfer and Training DOT staff

    • Conduct System Test and Acceptance

    • Complete System Acceptance Demonstration and Provide Documentation

    • Warranty Service


Deliverables

Deliverable # 6 Lease contract for La Bajada Backhaul Site connected throughout their use of the NM Rail Runner train transportation system and stations. - Removed From Project

Deliverable # 7 Contract for Broadband Wireless Service - Contract Executed/Complete

Deliverable # 8 Contract for WiMAX Spectrum Services - Contract Executed/Complete

Deliverable # 9 Contract for Operations & Maintenance - In Signature Process

Deliverable # 10 Implement Sandia Pueblo Station - Complete

Deliverables:


Operation
Operation: connected throughout their use of the NM Rail Runner train transportation system and stations.

  • Mid- Region of Government Council to manage the operations, support and maintenance of the RRWS.

  • Payment for the maintenance contract will be issued through MRCOG’s budget.


Lessons learned
Lessons Learned: connected throughout their use of the NM Rail Runner train transportation system and stations.

  • Realistic Implementation Timeline

    • Design/build reengineering possibilities

    • Inter-departmental reviews and approvals

    • Right-of-way and permitting issues

  • Federal Requirements

    • FCC requirements

    • Federal DOT

Budget

Budget: $2,656,237

Expended $2,453,099

9


ad