1 / 19

Hall B Beamline and Controls

Hall B Beamline and Controls. Hovanes Egiyan Jefferson Lab. Outline. Main Hall B Beamline Components Beam Tuning Procedure HV System in Hall B Temperature Sensors Summary. Expected g -Beam Parameters.

Download Presentation

Hall B Beamline and Controls

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hall B Beamline and Controls Hovanes Egiyan Jefferson Lab

  2. Outline • Main Hall B Beamline Components • Beam Tuning Procedure • HV System in Hall B • Temperature Sensors • Summary Hovanes Egiyan HPS Collaboration Meeting

  3. Expected g-Beam Parameters • Vacuum through out the system on a way of primary and scattered electrons, and bremsstrahlungphotons. • The target and the Si-tracker installed inside a vacuum enclosure. • Adequate beam diagnostics for beam profile, position and current measurements and monitoring. Hovanes Egiyan HPS Collaboration Meeting

  4. Magnets Torus Minitorus Radiator, Harp PS Converter, Photon Harp Photon Collimator PS Dipole Magnet Tagger Magnet Sweeping Magnet Torus Tagger PS 2C24 Location 2H01 Location MCC controls Hall B vacuum systems Not to Scale Controlled by MCC Hovanes Egiyan HPS Collaboration Meeting

  5. Power Supplies • Each magnet in Hall–B has its own power supply, controllable from the Hall B counting house. • Tagger magnet is controlled by MCC. • For Frascatti magnets (chicane) we would need to use CLAS Minitoruspower supply. Hovanes Egiyan HPS Collaboration Meeting

  6. Beam Positions • Existing nA BPMs • Owned by the Accelerator Division, we get EPICS PVs • Monitor electron beam position (precision ~20 mm) • Monitor electron beam current • Hall B BPMs are in three location: • For all runs: 2C21A, 2C24A, • For electron runs only: 2H01 • Harp scans for electron and photon beams • Position relative to previous scans • Photon beam profiler during photon beam runs • Usually it is in the shadow of the collimator. Hovanes Egiyan HPS Collaboration Meeting

  7. Beam Quality • Harp scans • At 2C21 (before Moeller target) e-beam • At 2C24 (@ radiator) e-beam • At 2H01 (@ converter)e- and g-beams • Dynamic range of 105 • What to do with the HPS detectors during harp scans? • Determines the X, Y and the diagonal beam profile. • Upstream and downstream beam halo counters • PMTs or scintillation counters positions around the beam pipe to measure the beam halo. • Upstream counters before CLAS target, may not be used for HDICE. • Downstream counters after the target. • Beam offset monitor • Circular array of thin fibers around beam. • Photon collimator • Collimate the photon beam to desired size before pair spectrometer (e.g. 3mm). Hovanes Egiyan HPS Collaboration Meeting

  8. Harps • Two wires move into beamline at ~0.5 mm/sec speed. • Some detector downstream see increased counting rates. • Scalers read out and recorded together with the motor position. • Synchronization can be important for high precision scans. • Harp scans need to be synchronized with scalers. Photons Electron Third wire will be added to existing Hall B beam scanner Hovanes Egiyan HPS Collaboration Meeting

  9. Example scan at 2C21 sx=140mm sy=43mm Hovanes Egiyan HPS Collaboration Meeting

  10. Harp Scan Optimized Optics sx=280mm sy=18mm Hovanes Egiyan HPS Collaboration Meeting

  11. Scalers • Hall B uses EPICS to monitor scalers: • 16 channel 40MHz Joerger VSC16 VME scaler module • simple hardware and sofware • 32 channel 200MHz SIS3801 VME scaler module • 64K FIFO • 2 latching bits • JLab new FPGA-based discriminator modules and FADCs also have scalers, but currently there is no EPICS interface • Combines discrimination and scaler functionality. • Work in progress for EPICS interface for the JLabdiscriminator modules. • May not have EPICS software on time for tests. • It would be nice to have “scalers” on SVTs, if they can be set up. Hovanes Egiyan HPS Collaboration Meeting

  12. Beam Intensity • Synchrotron Light Monitor (SLM) • Needs to be calibrated against BPM • Orbit dependent calibrations • BPMs can measure electron beam current. • Main measurement for photon runs. • Faraday Cup measures the beam current during electron runs. • Does not see beam during photon runs. • Will probably be blocked for electron runs with high currents. • Variations in scaler rates from detectors can indicate changes is intensity or quality changes. • Hall B has application to measure “60Hz” component of the beam intensity variation using scaler or F-Cup info. • We require 60Hz component be < 20%. • “60Hz” has not been a problem recently. Hovanes Egiyan HPS Collaboration Meeting

  13. Main EPICS GUI Beam Hovanes Egiyan HPS Collaboration Meeting

  14. Beam Tuning • Initially Hall-B beam always tuned by MCC first. • Directed into the tagger dump using Tagger Magnet • After MCC finished we verify the beam quality using Harp Scans at 2C21 and 2C24 • Halo/Peak < 10-4 • X- and Y- widths on harps less than 200 mm • For photon runs the g-beam is tuned through the collimator to the target. • Centering on the target • Centering the collimator • For electron runs the tagger magnet is degaussed, and the electron beam is tuned to the Faraday Cup. • We may check the beam profile with 2H01harp. • We center the beam on the target (MCC does the steering). • Continuously monitor BPMs, scalers and periodically perform harp scans. • Moeller runs may be required for circularly polarized g-beam. • Beam tuned into the tagger dump, Moller target is inserted into e-beam upstream of the tagger. • What is the impact on the HPS detectors? • What needs to be done during Moeller runs? Hovanes Egiyan HPS Collaboration Meeting

  15. High Voltages • Three types of HV mainframes are currently used in Hall B • LeCroy chassis were originally used for CLAS PMTs • Currently being phased out • Transitions to CAEN SY1527 chassis for CLAS is underway. • Main choice for CLAS12 upgrade • CAEN SY527 chassis are used for CLAS Drift Chambers and LAC • EPICS interface for VxWorks over CAENET exists (Sergey B.) • Interface is relatively slow. • All PMT HV are controlled and monitored from EPICS • EPICS Alarm Handler is used for trip notifications. • HV parameters saved and restored to/from text files. No real archiving. Hovanes Egiyan HPS Collaboration Meeting

  16. Temperature Sensors • CLAS IC colorimeter required stable temperature. • Instrumented with resistance temperature detectors (RTD). • Readout is done using NI FieldPoint network module. • LabView-to-EPICS interface was a problem sometimes, but it works with IC. • It is a good idea to go to direct EPICS interface for ECAL, but extra work. • SVT temperature monitoring in EPICS may require work. • Interface between EPICS and SVT DAQ should be created. • Undesirable feature of having to run DAQ for HW monitoring. Hovanes Egiyan HPS Collaboration Meeting

  17. Request • KristerBruhwel, NersesGevorgyan and myself will work on integrating the HPS and existing Hall B control systems. • We are familiar with Hall B setup, and less familiar with HPS requirements. • Involving more manpower in controls would be useful. • Need input from detector components • Description of the hardware and its functionality • Parameters to monitor and control, and how • Existing software/firmware description • Parameters that need archiving • Alarm conditions • Software interlocks • Backup/restore requirements Hovanes Egiyan HPS Collaboration Meeting

  18. Summary • Hall B beamline instrumentation and procedures can accommodate HPS during planned tests in spring. • Use Frascatti magnets with Minitorus PS for chicane during electron running. • Beamline components have necessary controls and software. • Minor modifications may be needed. • Having an early run plan will help identifying missing pieces. • Need information on controls requirements. • Try CAEN board for SVT with our EPICS driver for SY1527. • Some procurement/manufacturing may be needed for controls, e.g. motors. • New controls needed for: • SVT scans need controls software. • Target control, may be similar to CLAS eg2-run solid target system. Scans? • Temperature sensor monitoring on SVT (ECAL) need to be developed. • HV and LV controls may need attention. • Software interlock strategy for SVT protection is unclear. Hovanes Egiyan HPS Collaboration Meeting

  19. Thank You Hovanes Egiyan HPS Collaboration Meeting

More Related